IAC logo
IAC Assessment: DL0164
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0164
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2016
Principal Product Bleach
NAICS 325612 - Polish and Other Sanitation Good Manufacturing
SIC 2819 - Industrial Inorganic Chemicals, Nec
Sales $1,000,000-$5,000,000
# of Employees 49
Plant Area (Sq.Ft.) 10,000
Annual Production 15,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) DE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $314,425 69,966,343 kWh $0.00
Electricity Demand $495,083 131,167 kW-months/year $3.77
Natural Gas $109,877 13,410 MMBtu $8.19
TOTAL ENERGY COSTS $919,385
RECOMMENDED SAVINGS* $471,194 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,513
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION Savings:
$109,877
Cost:
$5,990
- - - - $109,877 13,410 -
-
kWh
-
-
kW-months/year
$109,877
13,410
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$18,095
Cost:
$32,300
$16,415 328,300 $1,680 448 - - $16,415
328,300
kWh
$1,680
448
kW-months/year
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$16,513
Cost:
$59,950
$14,976 299,720 $1,537 410 - - $14,976
299,720
kWh
$1,537
410
kW-months/year
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,804
Cost:
$11,335
$3,450 69,007 $354 95 - - $3,450
69,007
kWh
$354
95
kW-months/year
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,606
Cost:
$16,930
$2,991 59,836 $615 164 - - $2,991
59,836
kWh
$615
164
kW-months/year
-
-
MMBtu
06: 2.1336 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL Savings:
$319,299
Cost:
$522,826
$319,299 7,171,819 - - - - $319,299
7,171,819
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$471,194
Cost:
$649,331
$357,131 7,928,682 $4,186 1,117 $109,877 13,410 $357,131
7,928,682
kWh
$4,186
1,117
kW-months/year
$109,877
13,410
MMBtu
TOTAL IMPLEMENTED Savings:
$16,513
Cost:
$59,950
$14,976 299,720 $1,537 410 - - $14,976
299,720
kWh
$1,537
410
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas