IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

179

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0217 # 01 Y:2005 01 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $33,752 $27,000 Not Implemented
LE0217 # 02 Y:2005 02 2005 KEEP EQUIPMENT CLEAN $28,000 $840 Implemented
LE0217 # 03 Y:2005 03 2005 INSULATE BARE EQUIPMENT $16,487 $6,845 Implemented
LE0217 # 04 Y:2005 04 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,186 $3,000 Not Implemented
LE0217 # 05 Y:2005 05 2005 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,202 $4,000 Not Implemented
LE0217 # 06 Y:2005 06 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $2,764 $900 Implemented
LE0217 # 07 Y:2005 07 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,158 $900 Implemented
LE0217 # 08 Y:2005 08 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,372 $263 Implemented
LE0217 # 09 Y:2005 09 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,389 $240 Not Implemented
LE0217 # 10 Y:2005 10 2005 INSTALL OCCUPANCY SENSORS $874 $150 Not Implemented
LE0206 # 01 Y:2005 01 2005 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $135,669 $50,000 Not Implemented
LE0206 # 02 Y:2005 02 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $31,193 $5,000 Implemented
LE0206 # 03 Y:2005 03 2005 $11,880 $14,100 Implemented
LE0206 # 04 Y:2005 04 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,905 $2,500 Not Implemented
LE0206 # 05 Y:2005 05 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,894 $2,200 Not Implemented
LE0206 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $683 $200 Implemented
LE0206 # 07 Y:2005 07 2005 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $63,361 $382,500 Not Implemented
LE0178 # 01 Y:2004 01 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $15,185 $6,000 Not Implemented
LE0178 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,795 $75,903 Not Implemented
LE0178 # 03 Y:2004 03 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,543 $750 Not Implemented
LE0178 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,515 $300 Not Implemented
LE0178 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $5,757 $720 Not Implemented
LE0178 # 06 Y:2004 06 2004 CONTRACT A WOOD PALLET RECYCLING COMPANY $4,940 $0 Not Implemented
LE0178 # 07 Y:2004 07 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,837 $2,500 Not Implemented
LE0178 # 08 Y:2004 08 2004 OPTIMIZE PLANT POWER FACTOR $1,521 $6,250 Not Implemented