IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0043 # 07 Y:2009 07 2009 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,060 $0 Implemented
DL0043 # 06 Y:2009 06 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $470 $510 Not Implemented
DL0043 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $960 $2,000 Not Implemented
DL0043 # 04 Y:2009 04 2009 RECOVER WASTE HEAT FROM EQUIPMENT $600 $950 Not Implemented
DL0043 # 03 Y:2009 03 2009 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,472 $3,500 Implemented
DL0043 # 02 Y:2009 02 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,192 $0 Implemented
DL0043 # 01 Y:2009 01 2009 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,690 $18,300 Not Implemented
DL0041 # 05 Y:2009 05 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $3,520 $400 Implemented
DL0041 # 09 Y:2009 09 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,779 $3,858 Implemented
DL0041 # 08 Y:2009 08 2009 REDUCE VENTILATION AIR $5,400 $6,300 Not Implemented
DL0041 # 07 Y:2009 07 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,000 $348 Implemented
DL0041 # 06 Y:2009 06 2009 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,714 $1,000 Not Implemented
DL0041 # 04 Y:2009 04 2009 RECOVER WASTE HEAT FROM EQUIPMENT $4,029 $1,430 Implemented
DL0041 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,474 $10,800 Implemented
DL0041 # 02 Y:2009 02 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $20,570 $372 Not Implemented
DL0041 # 01 Y:2009 01 2009 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $29,782 $0 Not Implemented
DL0040 # 01 Y:2009 01 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $9,947 $25,000 Not Implemented
DL0040 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,533 $38,218 Implemented
DL0040 # 06 Y:2009 06 2009 INSTALL TIMERS AND/OR THERMOSTATS $4,313 $2,804 Not Implemented
DL0040 # 05 Y:2009 05 2009 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $12,823 $14,899 Not Implemented
DL0040 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,110 $3,000 Implemented
DL0040 # 03 Y:2009 03 2009 UPGRADE OBSOLETE EQUIPMENT $3,215 $0 Implemented
DL0040 # 02 Y:2009 02 2009 RECOVER WASTE HEAT FROM EQUIPMENT $2,331 $2,350 Implemented