Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
23
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0043 # 07 Y:2009 | 07 | 2009 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,060 | $0 | Implemented |
DL0043 # 06 Y:2009 | 06 | 2009 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $470 | $510 | Not Implemented |
DL0043 # 05 Y:2009 | 05 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $960 | $2,000 | Not Implemented |
DL0043 # 04 Y:2009 | 04 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $600 | $950 | Not Implemented |
DL0043 # 03 Y:2009 | 03 | 2009 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $5,472 | $3,500 | Implemented |
DL0043 # 02 Y:2009 | 02 | 2009 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,192 | $0 | Implemented |
DL0043 # 01 Y:2009 | 01 | 2009 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $9,690 | $18,300 | Not Implemented |
DL0041 # 05 Y:2009 | 05 | 2009 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,520 | $400 | Implemented |
DL0041 # 09 Y:2009 | 09 | 2009 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,779 | $3,858 | Implemented |
DL0041 # 08 Y:2009 | 08 | 2009 | REDUCE VENTILATION AIR | $5,400 | $6,300 | Not Implemented |
DL0041 # 07 Y:2009 | 07 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,000 | $348 | Implemented |
DL0041 # 06 Y:2009 | 06 | 2009 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,714 | $1,000 | Not Implemented |
DL0041 # 04 Y:2009 | 04 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,029 | $1,430 | Implemented |
DL0041 # 03 Y:2009 | 03 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,474 | $10,800 | Implemented |
DL0041 # 02 Y:2009 | 02 | 2009 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $20,570 | $372 | Not Implemented |
DL0041 # 01 Y:2009 | 01 | 2009 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $29,782 | $0 | Not Implemented |
DL0040 # 01 Y:2009 | 01 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $9,947 | $25,000 | Not Implemented |
DL0040 # 07 Y:2009 | 07 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,533 | $38,218 | Implemented |
DL0040 # 06 Y:2009 | 06 | 2009 | INSTALL TIMERS AND/OR THERMOSTATS | $4,313 | $2,804 | Not Implemented |
DL0040 # 05 Y:2009 | 05 | 2009 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $12,823 | $14,899 | Not Implemented |
DL0040 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,110 | $3,000 | Implemented |
DL0040 # 03 Y:2009 | 03 | 2009 | UPGRADE OBSOLETE EQUIPMENT | $3,215 | $0 | Implemented |
DL0040 # 02 Y:2009 | 02 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,331 | $2,350 | Implemented |