IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

509

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0598 # 11 Y:2023 11 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $3,193 $15,120 Not Implemented
UF0598 # 10 Y:2023 10 2023 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $5,588 $2,800 Implemented
UF0598 # 09 Y:2023 09 2023 INSTALL TURBULATORS $6,732 $7,500 Implemented
UF0598 # 08 Y:2023 08 2023 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $8,114 $0 Implemented
UF0598 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,338 $432 Implemented
UF0598 # 06 Y:2023 06 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $10,556 $22,000 Implemented
UF0598 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,433 $14,328 Implemented
UF0598 # 04 Y:2023 04 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $26,906 $25,280 Not Implemented
UF0598 # 03 Y:2023 03 2023 USE BATTERY STORAGE FOR DEMAND CONTROL $30,832 $8,310 Implemented
UF0598 # 02 Y:2023 02 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $61,221 $34,460 Implemented
UF0598 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $94,792 $289,896 Not Implemented
MI0404 # 06 Y:2022 06 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,392 $2,520 Not Implemented
MI0404 # 05 Y:2022 05 2022 REDUCE EXCESSIVE BOILER BLOWDOWN $1,720 $2,088 Not Implemented
MI0404 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,549 $1,660 Not Implemented
MI0404 # 03 Y:2022 03 2022 METER WASTE WATER $8,108 $1,533 Implemented
MI0404 # 02 Y:2022 02 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,764 $479 Not Implemented
MI0404 # 01 Y:2022 01 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $28,220 $580 Implemented
MI0397 # 06 Y:2021 06 2021 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,361 $40 Implemented
MI0397 # 05 Y:2021 05 2021 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,631 $40 Implemented
MI0397 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,160 $4,555 Not Implemented
MI0397 # 03 Y:2021 03 2021 METER WASTE WATER $2,172 $1,380 Not Implemented
MI0397 # 02 Y:2021 02 2021 AIR CONDITION ONLY SPACE NECESSARY $2,751 $480 Not Implemented
MI0397 # 01 Y:2021 01 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,589 $480 Not Implemented
MI0395 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,603 $2,100 Not Implemented
MI0395 # 02 Y:2021 02 2021 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $14,790 $1,380 Implemented