IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

167

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0915 # 02 Y:2018 02 2018 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,909 $580 Implemented
GT0915 # 01 Y:2018 01 2018 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,293 $100 Implemented
UF0506 # 06 Y:2017 06 2017 INSTALL SET-BACK TIMERS $1,014 $667 Implemented
UF0506 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,519 $1,169 Implemented
MI0305 # 11 Y:2016 11 2016 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $35 $19 Implemented
MI0305 # 10 Y:2016 10 2016 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $203 $50 Implemented
MI0305 # 08 Y:2016 08 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $380 $780 Implemented
MI0305 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,922 $1,700 Implemented
MI0304 # 12 Y:2016 12 2016 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $1,779 $3,350 Implemented
MI0304 # 11 Y:2016 11 2016 INSTALL OCCUPANCY SENSORS $1,803 $662 Implemented
MI0304 # 09 Y:2016 09 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,968 $7,680 Implemented
MI0304 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,388 $8,320 Implemented
MI0304 # 05 Y:2016 05 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,470 $43,770 Implemented
MI0304 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,015 $1,700 Implemented
MI0304 # 02 Y:2016 02 2016 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $30,447 $53,372 Implemented
MI0304 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $48,914 $119,809 Implemented
MI0272 # 03 Y:2015 03 2015 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $21,227 $27,707 Implemented
MI0272 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $811 $3,060 Implemented
MI0271 # 11 Y:2015 11 2015 INSTALL OCCUPANCY SENSORS $956 $373 Implemented
MI0271 # 03 Y:2015 03 2015 MINIMIZE WATER USAGE $15,193 $16,600 Implemented
MI0271 # 06 Y:2015 06 2015 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $4,265 $11,000 Implemented
MI0271 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,369 $4,590 Implemented
MI0270 # 06 Y:2015 06 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,773 $2,040 Implemented
MI0270 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,546 $5,294 Implemented
MI0270 # 15 Y:2015 15 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $970 $80 Implemented