IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

343

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0382 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,902 $900 Not Implemented
UF0382 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $1,971 $1,275 Not Implemented
UF0382 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,024 $7,567 Not Implemented
UF0382 # 05 Y:2006 05 2006 ADD AREA LIGHTING SWITCHES $515 $2,079 Not Implemented
UF0382 # 06 Y:2006 06 2006 LOWER CEILING TO REDUCE CONDITIONED SPACE $21,646 $1,350 Not Implemented
UF0382 # 07 Y:2006 07 2006 INSTALL OCCUPANCY SENSORS $1,876 $571 Not Implemented
UF0382 # 08 Y:2006 08 2006 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $5,305 $1,000 Not Implemented
UF0382 # 09 Y:2006 09 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $393 $0 Not Implemented
UF0382 # 10 Y:2006 10 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,973 $0 Not Implemented
UF0382 # 11 Y:2006 11 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,029 $3,200 Not Implemented
UF0382 # 12 Y:2006 12 2006 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $6,821 $0 Not Implemented
UF0382 # 13 Y:2006 13 2006 RECYCLE FLUORESCENT LAMPS $342 $3,237 Not Implemented
UF0382 # 14 Y:2006 14 2006 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $6,240 $8,000 Not Implemented
MI0123 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,833 $56,238 Not Implemented
MI0123 # 02 Y:2006 02 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $14,670 $84 Implemented
MI0123 # 03 Y:2006 03 2006 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,164 $90 Not Implemented
MI0123 # 04 Y:2006 04 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,583 $140 Implemented
MI0123 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,702 $1,018 Implemented
MI0123 # 06 Y:2006 06 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $845 $660 Implemented
MI0123 # 07 Y:2006 07 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $405 $0 Implemented
MI0123 # 08 Y:2006 08 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $403 $335 Implemented
MI0123 # 09 Y:2006 09 2006 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $290 $24 Implemented
MI0123 # 10 Y:2006 10 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $201 $0 Implemented
MI0096 # 01 Y:2004 01 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $6,113 $800 Not Implemented
MI0096 # 02 Y:2004 02 2004 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $3,213 $1,250 Implemented