IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

125

matching recommendations
Reset
NAICS 334 Computer and Electronic Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0353 # 02 Y:2019 02 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $5,753 $3,600 Implemented
MI0353 # 03 Y:2019 03 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,611 $480 Implemented
UF0510 # 01 Y:2017 01 2017 UPGRADE CONTROLS ON COMPRESSORS $1,528 $419 Implemented
UF0510 # 05 Y:2017 05 2017 AUTOMATE FINISHING PROCESS $84,346 $5,030 Implemented
UF0510 # 06 Y:2017 06 2017 INSTALL EQUIPMENT TO MOVE PRODUCT $944,640 $126,336 Implemented
UF0510 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $908 $689 Implemented
MI0301 # 09 Y:2016 09 2016 INSTALL OCCUPANCY SENSORS $1,252 $2,200 Implemented
MI0301 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,990 $35,099 Implemented
MI0301 # 08 Y:2016 08 2016 LOWER CEILING TO REDUCE CONDITIONED SPACE $1,288 $8,881 Implemented
MI0301 # 11 Y:2016 11 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $540 $280 Implemented
MI0298 # 08 Y:2016 08 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,220 $1,660 Implemented
MI0298 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,018 $53,398 Implemented
MI0298 # 01 Y:2016 01 2016 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $34,838 $36,314 Implemented
MI0294 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $42,734 $29,594 Implemented
MI0294 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,388 $1,660 Implemented
MI0294 # 05 Y:2016 05 2016 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $5,921 $1,441 Implemented
MI0294 # 07 Y:2016 07 2016 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $4,081 $4,200 Implemented
MI0294 # 08 Y:2016 08 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,830 $40 Implemented
MI0294 # 11 Y:2016 11 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,797 $40 Implemented
MI0294 # 16 Y:2016 16 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $342 $375 Implemented
MI0290 # 10 Y:2016 10 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,792 $280 Implemented
MI0290 # 11 Y:2016 11 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,703 $1,080 Implemented
MI0290 # 09 Y:2016 09 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,622 $40 Implemented
MI0290 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $3,248 $2,165 Implemented
MI0290 # 02 Y:2016 02 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $50,831 $40 Implemented