IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

111

matching recommendations
Reset
SIC 2037 Frozen Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0135 # 01 Y:2006 01 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $36,603 $244 Not Implemented
MI0135 # 02 Y:2006 02 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,711 $68,400 Not Implemented
MI0135 # 03 Y:2006 03 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $27,098 $5,400 Not Implemented
MI0135 # 04 Y:2006 04 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $8,764 $223 Not Implemented
MI0135 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,637 $1,074 Not Implemented
MI0135 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $495 $30 Not Implemented
MI0113 # 01 Y:2005 01 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $21,712 $52,535 Implemented
MI0113 # 02 Y:2005 02 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,230 $435 Implemented
MI0113 # 03 Y:2005 03 2005 INSULATE BARE EQUIPMENT $7,248 $1,138 Not Implemented
MI0113 # 04 Y:2005 04 2005 IMPROVE COMBUSTION CONTROL CAPABILITY $5,163 $17,100 Implemented
MI0113 # 05 Y:2005 05 2005 INSULATE BARE EQUIPMENT $1,868 $975 Not Implemented
UF0289 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,791 $2,728 Implemented
UF0289 # 02 Y:2001 02 2001 INSTALL OCCUPANCY SENSORS $2,566 $1,457 Not Implemented
UF0289 # 03 Y:2001 03 2001 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $5,004 $6,175 Implemented
UF0289 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $869 $500 Implemented
UF0289 # 05 Y:2001 05 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,758 $11,274 Implemented
UF0289 # 06 Y:2001 06 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $389 $1,895 Not Implemented
UF0289 # 07 Y:2001 07 2001 $35,100 $4,494 Implemented
UF0289 # 08 Y:2001 08 2001 $9,660 $4,612 Implemented
UF0216 # 01 Y:1999 01 1999 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $50,699 $251,200 Not Implemented
UF0216 # 02 Y:1999 02 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,441 $0 Not Implemented
UF0216 # 03 Y:1999 03 1999 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $6,211 $0 Implemented
UF0216 # 04 Y:1999 04 1999 RECOVER AND REUSE WASTE MATERIAL $11,243 $1,800 Not Implemented
UF0216 # 05 Y:1999 05 1999 $5,200 $0 Not Implemented
UF0216 # 06 Y:1999 06 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,365 $0 Implemented