Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

97

matching recommendations
Reset
SIC 205 Bakery Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0527 # 06 Y:2019 06 2019 INSTALL OCCUPANCY SENSORS $1,039 $1,393 Implemented
UF0527 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,268 $21,268 Implemented
UF0527 # 02 Y:2019 02 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,537 $24,798 Implemented
UF0527 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,160 $456 Implemented
UF0527 # 07 Y:2019 07 2019 INSTALL AN UNINTERUPTABLE POWER SUPPLY $24,935 $1,665 Implemented
UF0526 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,088 $496 Implemented
UF0526 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,738 $13,541 Implemented
UF0526 # 06 Y:2019 06 2019 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $3,132 $9,341 Implemented
UF0526 # 01 Y:2019 01 2019 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $727,193 $3,000,000 Implemented
UF0526 # 02 Y:2019 02 2019 RECOVER WASTE HEAT FROM EQUIPMENT $95,677 $50,000 Implemented
UF0526 # 03 Y:2019 03 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $75,075 $4,000 Implemented
UF0526 # 04 Y:2019 04 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,403 $0 Implemented
UF0515 # 06 Y:2018 06 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,453 $512 Implemented
UF0515 # 05 Y:2018 05 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,553 $2,800 Implemented
UF0515 # 04 Y:2018 04 2018 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $11,421 $29,224 Implemented
UF0515 # 03 Y:2018 03 2018 RECOVER WASTE HEAT FROM EQUIPMENT $13,104 $23,300 Implemented
UF0515 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,829 $63,355 Implemented
MI0277 # 09 Y:2015 09 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,440 $40 Implemented
MI0277 # 10 Y:2015 10 2015 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,737 $3,280 Implemented
MI0277 # 11 Y:2015 11 2015 USE OPTIMUM THICKNESS INSULATION $1,507 $1,610 Implemented
MI0277 # 12 Y:2015 12 2015 INSTALL OCCUPANCY SENSORS $1,295 $290 Implemented
MI0277 # 13 Y:2015 13 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $574 $1,400 Implemented
MI0277 # 14 Y:2015 14 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $459 $90 Implemented
MI0277 # 08 Y:2015 08 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,698 $639 Implemented
MI0277 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,327 $16,640 Implemented