IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

44

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0072 # 11 Y:1993 11 1993 INSTALL / REPAIR INSULATION ON STEAM LINES $460 $407 Implemented
UF0072 # 10 Y:1993 10 1993 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $814 $1,392 Not Implemented
UF0072 # 09 Y:1993 09 1993 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $488 $2,000 Implemented
UF0072 # 08 Y:1993 08 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $236 $500 Implemented
UF0072 # 07 Y:1993 07 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,816 $1,000 Implemented
UF0072 # 06 Y:1993 06 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,938 $20,958 Implemented
UF0072 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,736 $17,345 Not Implemented
UF0072 # 02 Y:1993 02 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $21,182 $1,060 Not Implemented
UF0072 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,545 $5,513 Not Implemented
UF0072 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $431 $391 Not Implemented
UF0072 # 05 Y:1993 05 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,347 $1,000 Implemented
UF0070 # 01 Y:1993 01 1993 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $10,702 $15,600 Not Implemented
UF0070 # 07 Y:1993 07 1993 INSTALL OCCUPANCY SENSORS $1,008 $128 Not Implemented
UF0070 # 02 Y:1993 02 1993 INSULATE BARE EQUIPMENT $4,866 $2,520 Implemented
UF0070 # 03 Y:1993 03 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,941 $8,198 Implemented
UF0070 # 04 Y:1993 04 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,961 $6,100 Not Implemented
UF0070 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,113 $2,339 Implemented
UF0070 # 09 Y:1993 09 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,413 $14,097 Not Implemented
UF0070 # 11 Y:1993 11 1993 INSTALL TIMERS AND/OR THERMOSTATS $803 $945 Not Implemented
UF0070 # 12 Y:1993 12 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,248 $0 Implemented
UF0070 # 06 Y:1993 06 1993 INSTALL SPECTRAL REFLECTORS / DELAMP $4,406 $6,730 Not Implemented
UF0070 # 13 Y:1993 13 1993 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $515 $1,000 Not Implemented
UF0070 # 08 Y:1993 08 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $433 $548 Not Implemented
UF0070 # 10 Y:1993 10 1993 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,036 $1,025 Not Implemented
UF0068 # 05 Y:1993 05 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $880 $750 Not Implemented