IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

255

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0285 # 04 Y:2015 04 2015 LOWER CEILING TO REDUCE CONDITIONED SPACE $13,892 $76,650 Implemented
MI0284 # 07 Y:2015 07 2015 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $1,588 $2,527 Implemented
MI0284 # 03 Y:2015 03 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $28,415 $160 Implemented
MI0284 # 02 Y:2015 02 2015 LOWER CEILING TO REDUCE CONDITIONED SPACE $28,449 $55,650 Implemented
MI0284 # 01 Y:2015 01 2015 UTILIZE A LESS EXPENSIVE COOLING METHOD $77,529 $180,000 Implemented
MI0284 # 04 Y:2015 04 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $11,198 $6,520 Implemented
MI0240 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,935 $3,315 Implemented
MI0240 # 05 Y:2013 05 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $544 $208 Implemented
MI0240 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,769 $1,660 Implemented
MI0240 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $1,829 $4,802 Implemented
MI0240 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $2,089 $4,173 Implemented
MI0240 # 01 Y:2013 01 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $15,757 $91,089 Implemented
MI0238 # 01 Y:2013 01 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $33,139 $21,580 Implemented
MI0238 # 02 Y:2013 02 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $11,581 $2,980 Implemented
MI0238 # 04 Y:2013 04 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $8,487 $160 Implemented
MI0238 # 07 Y:2013 07 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $5,216 $2,600 Implemented
MI0238 # 09 Y:2013 09 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,605 $5,740 Implemented
MI0238 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,459 $1,660 Implemented
MI0219 # 07 Y:2012 07 2012 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $895 $2,320 Implemented
MI0219 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,003 $37,014 Implemented
MI0219 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,275 $1,660 Implemented
MI0219 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $5,535 $1,800 Implemented
MI0219 # 05 Y:2012 05 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $2,739 $6,080 Implemented
MI0219 # 08 Y:2012 08 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $734 $120 Implemented
MI0197 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,774 $1,210 Implemented