IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0022 # 03 Y:2001 03 2001 $4,177 $3,116 Not Implemented
MI0022 # 05 Y:2001 05 2001 $6,250 $3,000 Not Implemented
MI0022 # 04 Y:2001 04 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,817 $56 Not Implemented
MI0022 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,195 $331 Not Implemented
MI0022 # 01 Y:2001 01 2001 METER WASTE WATER $2,560 $3,650 Not Implemented
UF0283 # 04 Y:2001 04 2001 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $82,496 $400 Not Implemented
UF0283 # 08 Y:2001 08 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,806 $0 Implemented
UF0283 # 07 Y:2001 07 2001 $59,856 $420,000 Not Implemented
UF0283 # 01 Y:2001 01 2001 INSTALL OCCUPANCY SENSORS $1,347 $2,485 Implemented
UF0283 # 03 Y:2001 03 2001 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $9,278 $76,200 Not Implemented
UF0283 # 02 Y:2001 02 2001 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $13,166 $9,333 Not Implemented
UF0283 # 06 Y:2001 06 2001 CONTRACT A WOOD PALLET RECYCLING COMPANY $720 $0 Not Implemented
UF0283 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,592 $1,440 Implemented
MI0020 # 06 Y:2001 06 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,932 $256 Not Implemented
MI0020 # 07 Y:2001 07 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,304 $256 Not Implemented
MI0020 # 05 Y:2001 05 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $21,743 $16 Not Implemented
MI0020 # 04 Y:2001 04 2001 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $48,965 $16 Not Implemented
MI0020 # 03 Y:2001 03 2001 $14,899 $139 Not Implemented
MI0020 # 02 Y:2001 02 2001 REDESIGN PROCESS $24,074 $13,312 Not Implemented
MI0020 # 01 Y:2001 01 2001 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $279,552 $120 Not Implemented
MI0018 # 03 Y:2001 03 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $34,167 $13 Implemented
MI0018 # 07 Y:2001 07 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,065 $13 Implemented
MI0018 # 06 Y:2001 06 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,572 $208 Implemented
MI0018 # 05 Y:2001 05 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $12,698 $13 Implemented
MI0018 # 04 Y:2001 04 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $8,070 $312 Implemented