Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsSIC | 38 | Instruments And Related Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0287 # 10 Y:2001 | 10 | 2001 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $29,250 | $3,000 | Implemented |
UF0287 # 09 Y:2001 | 09 | 2001 | PAY UTILITY BILLS ON TIME | $15,147 | $0 | Not Implemented |
UF0287 # 08 Y:2001 | 08 | 2001 | $39,000 | $5,247 | Implemented | |
UF0287 # 07 Y:2001 | 07 | 2001 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $9,303 | $225 | Not Implemented |
UF0287 # 06 Y:2001 | 06 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,358 | $0 | Implemented |
UF0287 # 05 Y:2001 | 05 | 2001 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $28,709 | $20,000 | Implemented |
UF0287 # 04 Y:2001 | 04 | 2001 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $3,729 | $10,788 | Not Implemented |
UF0287 # 03 Y:2001 | 03 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,637 | $16,038 | Not Implemented |
UF0287 # 02 Y:2001 | 02 | 2001 | INSTALL OCCUPANCY SENSORS | $1,260 | $2,081 | Not Implemented |
UF0287 # 01 Y:2001 | 01 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,092 | $920 | Implemented |
MI0024 # 04 Y:2001 | 04 | 2001 | ADD AREA LIGHTING SWITCHES | $1,333 | $700 | n/a |
MI0024 # 05 Y:2001 | 05 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $200 | $2 | n/a |
MI0024 # 03 Y:2001 | 03 | 2001 | ADD AREA LIGHTING SWITCHES | $2,108 | $1,000 | n/a |
MI0024 # 02 Y:2001 | 02 | 2001 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $11,590 | $7 | n/a |
MI0024 # 01 Y:2001 | 01 | 2001 | ISOLATE HOT OR COLD EQUIPMENT | $156,000 | $10,000 | n/a |
MI0002 # 01 Y:2001 | 01 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $9,063 | $414 | Not Implemented |
MI0002 # 09 Y:2001 | 09 | 2001 | $94,000 | $33,124 | Not Implemented | |
MI0002 # 08 Y:2001 | 08 | 2001 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $3,409 | $20 | Not Implemented |
MI0002 # 07 Y:2001 | 07 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,119 | $690 | Not Implemented |
MI0002 # 06 Y:2001 | 06 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,800 | $35 | Not Implemented |
MI0002 # 05 Y:2001 | 05 | 2001 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,034 | $3,531 | Not Implemented |
MI0002 # 04 Y:2001 | 04 | 2001 | $47,000 | $300 | Not Implemented | |
MI0002 # 03 Y:2001 | 03 | 2001 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $30,943 | $20 | Not Implemented |
MI0002 # 02 Y:2001 | 02 | 2001 | UPGRADE OBSOLETE EQUIPMENT | $22,409 | $6,500 | Not Implemented |