Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsSIC | 384 | Medical Instruments And Supplies |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0429 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,166 | $12,997 | Implemented |
MI0429 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $31,739 | $1,660 | Implemented |
UF0593 # 09 Y:2023 | 09 | 2023 | LEVEL THREE - INSTALL OR MODIFY CONTROL SYSTEM WITH COMMUNICATION AND NONLOCAL EXTERNAL INFORMATION (I.E. WEATHER FORECA | $36,476 | $11,225 | Implemented |
UF0593 # 08 Y:2023 | 08 | 2023 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $121,588 | $12,000 | Implemented |
UF0593 # 07 Y:2023 | 07 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,604 | $0 | Implemented |
UF0593 # 05 Y:2023 | 05 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $62,208 | $25,500 | Implemented |
UF0593 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $64,641 | $136,253 | Implemented |
UF0593 # 03 Y:2023 | 03 | 2023 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $97,641 | $400,000 | Implemented |
UF0593 # 02 Y:2023 | 02 | 2023 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $110,377 | $92,132 | Implemented |
UF0593 # 01 Y:2023 | 01 | 2023 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $131,807 | $215,600 | Implemented |
UF0589 # 10 Y:2023 | 10 | 2023 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $5,304 | $4,300 | Implemented |
UF0589 # 11 Y:2023 | 11 | 2023 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $4,770 | $2,800 | Implemented |
UF0589 # 12 Y:2023 | 12 | 2023 | INSTALL TURBULATORS | $4,595 | $7,500 | Implemented |
UF0589 # 13 Y:2023 | 13 | 2023 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $4,532 | $754 | Implemented |
UF0589 # 14 Y:2023 | 14 | 2023 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $4,316 | $3,069 | Implemented |
UF0589 # 15 Y:2023 | 15 | 2023 | INSTALL OCCUPANCY SENSORS | $2,868 | $9,968 | Implemented |
UF0589 # 16 Y:2023 | 16 | 2023 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $2,322 | $0 | Implemented |
UF0589 # 17 Y:2023 | 17 | 2023 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $88,974 | $10,000 | Implemented |
UF0589 # 09 Y:2023 | 09 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,438 | $0 | Implemented |
UF0589 # 08 Y:2023 | 08 | 2023 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $13,274 | $30,000 | Implemented |
UF0589 # 07 Y:2023 | 07 | 2023 | CLEAN CONDENSER TUBES | $15,589 | $0 | Implemented |
UF0589 # 06 Y:2023 | 06 | 2023 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $18,200 | $14,400 | Implemented |
UF0589 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $42,787 | $43,077 | Implemented |
UF0589 # 04 Y:2023 | 04 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $71,810 | $25,340 | Implemented |
UF0589 # 02 Y:2023 | 02 | 2023 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $505,092 | $2,115,660 | Implemented |