IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

104

matching recommendations
Reset
SIC 3841 Surgical And Medical Instruments
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0259 # 04 Y:2014 04 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,728 $760 Implemented
MI0259 # 07 Y:2014 07 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,090 $1,040 Implemented
MI0259 # 08 Y:2014 08 2014 INSTALL OCCUPANCY SENSORS $1,545 $622 Implemented
MI0259 # 10 Y:2014 10 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $629 $1,660 Implemented
MI0259 # 11 Y:2014 11 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $183 $80 Implemented
MI0208 # 01 Y:2011 01 2011 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $40,370 $292,600 Implemented
MI0208 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,143 $16,918 Implemented
MI0208 # 03 Y:2011 03 2011 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $25,727 $48,170 Implemented
MI0208 # 06 Y:2011 06 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,355 $1,320 Implemented
MI0208 # 07 Y:2011 07 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,789 $2,400 Implemented
MI0207 # 03 Y:2011 03 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $61,926 $2,550 Implemented
MI0207 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,901 $1,320 Implemented
UF0399 # 03 Y:2007 03 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,878 $437 Implemented
UF0399 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,852 $0 Implemented
UF0399 # 10 Y:2007 10 2007 INSTALL OCCUPANCY SENSORS $1,761 $404 Implemented
UF0399 # 11 Y:2007 11 2007 RECYCLE FLUORESCENT LAMPS $1,005 $3,486 Implemented
UF0399 # 12 Y:2007 12 2007 $74,852 $731 Implemented
MI0111 # 02 Y:2005 02 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $13,290 $84 Implemented
MI0111 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,062 $7,706 Implemented
UF0141 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,249 $2,934 Implemented
UF0141 # 03 Y:1996 03 1996 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $18,184 $13,550 Implemented
UF0141 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,365 $750 Implemented
UF0141 # 05 Y:1996 05 1996 USE SYNTHETIC LUBRICANT $945 $250 Implemented
UF0018 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,125 $12,242 Implemented
UF0018 # 02 Y:1992 02 1992 INSTALL SPECTRAL REFLECTORS / DELAMP $35,508 $41,505 Implemented