Search recommendations based on selected criteria.
RESET

2,851

matching recommendations
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID Products Savings Cost
UF0518 # 06 Y:2018 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $109,000 $41,200
UF0518 # 05 Y:2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $1,145 $9,600
UF0518 # 04 Y:2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,401 $0
UF0518 # 03 Y:2018 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $3,844 $586
UF0518 # 02 Y:2018 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $9,684 $1,980
UF0518 # 01 Y:2018 USE SOLAR HEAT TO MAKE ELECTRICTY $24,028 $167,216
GT0915 # 03 Y:2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,057 $13,064
GT0915 # 01 Y:2018 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,293 $100
GT0915 # 02 Y:2018 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,909 $580
MI0335 # 08 Y:2018 RECOVER HEAT FROM OVEN EXHAUST / KILNS $1,157 $5,370
MI0335 # 01 Y:2018 TURN OFF EQUIPMENT WHEN NOT IN USE $4,545 $3,280
MI0335 # 07 Y:2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,235 $2,520
MI0335 # 06 Y:2018 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $1,505 $480
MI0335 # 05 Y:2018 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,932 $7,536
MI0335 # 04 Y:2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,798 $7,385
Back to Top