Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,556
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0610 # 08 Y:2024 | 08 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $1,315 | $4,000 | n/a |
UF0610 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $108,899 | $322,608 | n/a |
UF0610 # 09 Y:2024 | 09 | 2024 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $54,895 | $0 | n/a |
UF0610 # 07 Y:2024 | 07 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,062 | $7,200 | n/a |
UF0610 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $4,345 | $2,330 | n/a |
UF0610 # 02 Y:2024 | 02 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $28,883 | $18,333 | n/a |
UF0610 # 10 Y:2024 | 10 | 2024 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $15,675 | $25,000 | n/a |
UF0610 # 03 Y:2024 | 03 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $24,012 | $25,400 | n/a |
UF0610 # 04 Y:2024 | 04 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $9,119 | $36,000 | n/a |
UF0610 # 11 Y:2024 | 11 | 2024 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $4,482 | $3,330 | n/a |
UF0610 # 06 Y:2024 | 06 | 2024 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $2,691 | $5,108 | n/a |
MI0438 # 02 Y:2024 | 02 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $116,907 | $0 | n/a |
MI0438 # 07 Y:2024 | 07 | 2024 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $2,582 | $1,027 | n/a |
MI0438 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $292,161 | $663,964 | n/a |
MI0438 # 08 Y:2024 | 08 | 2024 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $2,139 | $40 | n/a |
MI0438 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,979 | $1,660 | n/a |
MI0438 # 06 Y:2024 | 06 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,248 | $860 | n/a |
MI0438 # 04 Y:2024 | 04 | 2024 | METER WASTE WATER | $26,088 | $956 | n/a |
MI0438 # 03 Y:2024 | 03 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $52,928 | $1,320 | n/a |
UF0609 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $104,116 | $322,608 | n/a |
UF0609 # 02 Y:2024 | 02 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $38,174 | $25,504 | n/a |
UF0609 # 07 Y:2024 | 07 | 2024 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $21,071 | $25,000 | n/a |
UF0609 # 03 Y:2024 | 03 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $16,360 | $25,380 | n/a |
UF0609 # 05 Y:2024 | 05 | 2024 | OPTIMIZE PLANT POWER FACTOR | $3,546 | $9,000 | n/a |
UF0609 # 06 Y:2024 | 06 | 2024 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $35,940 | $0 | n/a |