IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,541

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0132 # 07 Y:1995 07 1995 USE POWER DURING OFF-PEAK PERIODS $3,802 $0 Not Implemented
UF0131 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,967 $13,352 Implemented
UF0131 # 02 Y:1995 02 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,319 $204 Not Implemented
UF0131 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,115 $14,659 Implemented
UF0131 # 04 Y:1995 04 1995 INSTALL OCCUPANCY SENSORS $677 $1,152 Not Implemented
UF0131 # 05 Y:1995 05 1995 DISCONNECT BALLASTS $553 $1,400 Not Implemented
UF0131 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,001 $1,116 Not Implemented
UF0131 # 07 Y:1995 07 1995 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $8,226 $11,400 Not Implemented
UF0131 # 08 Y:1995 08 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $845 $350 Implemented
UF0131 # 09 Y:1995 09 1995 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $110,283 $250,000 Not Implemented
UF0131 # 10 Y:1995 10 1995 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $85,495 $8,000 Implemented
UF0124 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,140 $5,883 Implemented
UF0124 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,076 $4,354 Implemented
UF0124 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,637 $350 Implemented
UF0124 # 04 Y:1995 04 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $222 $700 Implemented
UF0124 # 05 Y:1995 05 1995 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $1,043 $0 Implemented
UF0124 # 06 Y:1995 06 1995 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $413 $950 Not Implemented
UF0124 # 07 Y:1995 07 1995 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $30,913 $100,000 Not Implemented
UF0124 # 08 Y:1995 08 1995 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,700 $0 Implemented
UF0124 # 09 Y:1995 09 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $10,157 $5,000 Not Implemented
UF0130 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,968 $10,600 Implemented
UF0130 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,122 $2,853 Implemented
UF0130 # 03 Y:1995 03 1995 INSTALL OCCUPANCY SENSORS $305 $448 Not Implemented
UF0130 # 04 Y:1995 04 1995 USE PHOTOCELL CONTROLS $1,056 $1,200 Implemented
UF0130 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,302 $350 Implemented