Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
359
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0050 # 04 Y:2002 | 04 | 2002 | INSTALL SPECTRAL REFLECTORS / DELAMP | $10,046 | $21,150 | Not Implemented |
MI0050 # 06 Y:2002 | 06 | 2002 | UPGRADE CONTROLS ON COMPRESSORS | $2,860 | $1,338 | Not Implemented |
MI0050 # 05 Y:2002 | 05 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,880 | $2 | Not Implemented |
MI0050 # 02 Y:2002 | 02 | 2002 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $95,397 | $66,000 | Not Implemented |
MI0050 # 01 Y:2002 | 01 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $173,081 | $82,800 | Not Implemented |
MI0050 # 03 Y:2002 | 03 | 2002 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $53,360 | $5,000 | Not Implemented |
UF0312 # 04 Y:2002 | 04 | 2002 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $10,427 | $20,000 | Implemented |
UF0312 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,934 | $500 | Not Implemented |
UF0312 # 02 Y:2002 | 02 | 2002 | INSTALL OCCUPANCY SENSORS | $1,258 | $6,000 | Not Implemented |
UF0312 # 01 Y:2002 | 01 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $6,162 | $7,981 | Implemented |
UF0312 # 05 Y:2002 | 05 | 2002 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $38,400 | $31,277 | Not Implemented |
UF0312 # 06 Y:2002 | 06 | 2002 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $7,131 | $1,074 | Implemented |
UF0311 # 05 Y:2002 | 05 | 2002 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $31,940 | $189,000 | Not Implemented |
UF0311 # 02 Y:2002 | 02 | 2002 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $20,300 | $1,640 | Implemented |
UF0311 # 06 Y:2002 | 06 | 2002 | RECYCLE FLUORESCENT LAMPS | $10,412 | $1,895 | Not Implemented |
UF0311 # 03 Y:2002 | 03 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,246 | $0 | Not Implemented |
UF0311 # 01 Y:2002 | 01 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,935 | $119,640 | Not Implemented |
UF0311 # 04 Y:2002 | 04 | 2002 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $15,812 | $20,000 | Implemented |
UF0306 # 06 Y:2002 | 06 | 2002 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $48,671 | $1,074 | Not Implemented |
UF0306 # 05 Y:2002 | 05 | 2002 | RECOVER AND REUSE WASTE MATERIAL | $10,048 | $0 | Not Implemented |
UF0306 # 04 Y:2002 | 04 | 2002 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $592,558 | $1,120,000 | Not Implemented |
UF0306 # 03 Y:2002 | 03 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,327 | $0 | Implemented |
UF0306 # 07 Y:2002 | 07 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $208,938 | $33,980 | Not Implemented |
UF0306 # 08 Y:2002 | 08 | 2002 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $107,170 | $114,485 | Not Implemented |
UF0306 # 02 Y:2002 | 02 | 2002 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $1,764 | $7,800 | Not Implemented |