IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

309

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0372 # 04 Y:2005 04 2005 INSTALL OCCUPANCY SENSORS $3,070 $1,427 Not Implemented
UF0372 # 11 Y:2005 11 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,054 $4,144 Implemented
UF0372 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,223 $16,223 Implemented
UF0372 # 05 Y:2005 05 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,158 $28,067 Not Implemented
UF0372 # 14 Y:2005 14 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,074,880 $989 Implemented
UF0372 # 01 Y:2005 01 2005 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $22,802 $2,143 Implemented
UF0372 # 08 Y:2005 08 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,724 $39,583 Not Implemented
UF0372 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,373 $10,886 Implemented
UF0372 # 13 Y:2005 13 2005 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $14,477 $62,000 Not Implemented
UF0372 # 10 Y:2005 10 2005 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $26,386 $121,152 Not Implemented
UF0372 # 09 Y:2005 09 2005 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $43,072 $138,308 Not Implemented
UF0372 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $55,681 $32,374 Not Implemented
UF0372 # 12 Y:2005 12 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,916 $15,057 Implemented
UF0372 # 03 Y:2005 03 2005 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $2,383 $0 Implemented
UF0371 # 08 Y:2005 08 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,385 $0 Implemented
UF0371 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $2,952 $4,688 Not Implemented
UF0371 # 11 Y:2005 11 2005 IMPROVE SPACE COMFORT CONDITIONING $1,596 $26,800 Implemented
UF0371 # 13 Y:2005 13 2005 IMPROVE SPACE COMFORT CONDITIONING $100,000 $50,000 Implemented
UF0371 # 12 Y:2005 12 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $100,000 $25,000 Implemented
UF0371 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,368 $650 Implemented
UF0371 # 10 Y:2005 10 2005 REDESIGN PROCESS $61,200 $1,000,000 Not Implemented
UF0371 # 06 Y:2005 06 2005 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $7,254 $20,000 Not Implemented
UF0371 # 09 Y:2005 09 2005 LOWER CEILING TO REDUCE CONDITIONED SPACE $5,477 $800 Implemented
UF0371 # 01 Y:2005 01 2005 LOWER CEILING TO REDUCE CONDITIONED SPACE $6,120 $978 Implemented
UF0371 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,453 $675 Implemented