Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
208
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0623 # 03 Y:2024 | 03 | 2024 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $4,089 | $5,440 | n/a |
UF0623 # 02 Y:2024 | 02 | 2024 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $11,057 | $4,000 | n/a |
UF0623 # 01 Y:2024 | 01 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $21,088 | $3,402 | n/a |
UF0623 # 07 Y:2024 | 07 | 2024 | IMPROVE COMBUSTION CONTROL CAPABILITY | $958 | $1,400 | n/a |
UF0623 # 06 Y:2024 | 06 | 2024 | INSTALL TURBULATORS | $979 | $3,750 | n/a |
UF0623 # 08 Y:2024 | 08 | 2024 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $56,000 | $20,720 | n/a |
UF0623 # 05 Y:2024 | 05 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,616 | $0 | n/a |
UF0623 # 04 Y:2024 | 04 | 2024 | INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK | $2,627 | $2,343 | n/a |
UF0621 # 12 Y:2024 | 12 | 2024 | INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM | $8,191 | $40,000 | n/a |
UF0621 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,063 | $456 | n/a |
UF0621 # 08 Y:2024 | 08 | 2024 | DEVELOP STANDARD OPERATING PROCEDURES | $15,000 | $700 | n/a |
UF0621 # 04 Y:2024 | 04 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $9,670 | $4,795 | n/a |
UF0621 # 10 Y:2024 | 10 | 2024 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $13,815 | $60,000 | n/a |
UF0621 # 06 Y:2024 | 06 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,446 | $25,340 | n/a |
UF0621 # 05 Y:2024 | 05 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,374 | $17,850 | n/a |
UF0621 # 09 Y:2024 | 09 | 2024 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $15,000 | $3,868 | n/a |
UF0621 # 11 Y:2024 | 11 | 2024 | IMPROVE SPACE COMFORT CONDITIONING | $11,856 | $4,760 | n/a |
UF0621 # 02 Y:2024 | 02 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $26,440 | $12,390 | n/a |
UF0621 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $106,203 | $322,608 | n/a |
UF0621 # 07 Y:2024 | 07 | 2024 | INSTALL OCCUPANCY SENSORS | $1,807 | $3,048 | n/a |
UF0620 # 06 Y:2024 | 06 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $2,156 | $350 | n/a |
UF0620 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,109 | $2,611 | n/a |
UF0620 # 08 Y:2024 | 08 | 2024 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $1,958 | $2,120 | n/a |
UF0620 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $98,702 | $322,644 | n/a |
UF0620 # 03 Y:2024 | 03 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $9,070 | $5,250 | n/a |