IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0021 # 05 Y:2001 05 2001 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,250 $4,200 Implemented
MI0021 # 04 Y:2001 04 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,275 $7 Not Implemented
MI0021 # 03 Y:2001 03 2001 $3,634 $113 Not Implemented
MI0021 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,770 $312 Implemented
MI0021 # 01 Y:2001 01 2001 METER WASTE WATER $13,904 $3,650 Not Implemented
MI0025 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $694 $1,778 Implemented
MI0025 # 04 Y:2001 04 2001 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,050 $100 Implemented
MI0025 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $492 $2 Not Implemented
MI0025 # 02 Y:2001 02 2001 ELIMINATE A BY-PRODUCT $35,000 $100 Not Implemented
MI0025 # 01 Y:2001 01 2001 RECOVER MECHANICAL ENERGY $165,750 $15,000 Not Implemented
MI0024 # 05 Y:2001 05 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $200 $2 n/a
MI0024 # 04 Y:2001 04 2001 ADD AREA LIGHTING SWITCHES $1,333 $700 n/a
MI0024 # 03 Y:2001 03 2001 ADD AREA LIGHTING SWITCHES $2,108 $1,000 n/a
MI0024 # 02 Y:2001 02 2001 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $11,590 $7 n/a
MI0024 # 01 Y:2001 01 2001 ISOLATE HOT OR COLD EQUIPMENT $156,000 $10,000 n/a
MI0020 # 07 Y:2001 07 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,304 $256 Not Implemented
MI0020 # 06 Y:2001 06 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,932 $256 Not Implemented
MI0020 # 05 Y:2001 05 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $21,743 $16 Not Implemented
MI0020 # 04 Y:2001 04 2001 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $48,965 $16 Not Implemented
MI0020 # 03 Y:2001 03 2001 $14,899 $139 Not Implemented
MI0020 # 02 Y:2001 02 2001 REDESIGN PROCESS $24,074 $13,312 Not Implemented
MI0020 # 01 Y:2001 01 2001 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $279,552 $120 Not Implemented
UF0282 # 09 Y:2001 09 2001 $35,100 $4,494 Implemented
UF0282 # 08 Y:2001 08 2001 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $78,000 $98,800 Not Implemented
UF0282 # 07 Y:2001 07 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $682 $1,895 Not Implemented