IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

164

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0182 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,694 $1,210 Implemented
MI0182 # 04 Y:2009 04 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $14,610 $2,000 Implemented
MI0182 # 03 Y:2009 03 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $18,913 $40 Implemented
MI0182 # 02 Y:2009 02 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $24,940 $10,000 Implemented
MI0182 # 01 Y:2009 01 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,441 $12,707 Implemented
UF0426 # 10 Y:2009 10 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,591 $568 Not Implemented
UF0426 # 01 Y:2009 01 2009 CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS $20,276 $4,000 Not Implemented
UF0426 # 02 Y:2009 02 2009 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $146,810 $3,192 Not Implemented
UF0426 # 03 Y:2009 03 2009 RECYCLE FLUORESCENT LAMPS $328 $3,405 Not Implemented
UF0426 # 04 Y:2009 04 2009 INSTALL SKYLIGHTS $2,555 $238 Implemented
UF0426 # 05 Y:2009 05 2009 INSTALL OCCUPANCY SENSORS $1,764 $481 Not Implemented
UF0426 # 06 Y:2009 06 2009 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $50,000 $25,000 Not Implemented
UF0426 # 07 Y:2009 07 2009 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,382 $2,382 Not Implemented
UF0426 # 09 Y:2009 09 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,528 $628 Implemented
UF0426 # 15 Y:2009 15 2009 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $111,037 $4,000 Not Implemented
UF0426 # 14 Y:2009 14 2009 DEVELOP A REPAIR/REPLACE POLICY $1,083 $0 Not Implemented
UF0426 # 13 Y:2009 13 2009 INSTALL COMMON HEADER ON COMPRESSORS $229,898 $0 Not Implemented
UF0426 # 11 Y:2009 11 2009 INSTALL OCCUPANCY SENSORS $24,539 $0 Not Implemented
UF0426 # 12 Y:2009 12 2009 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $37,500 $4,483 Not Implemented
UF0426 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $234,287 $67,220 Not Implemented
UF0425 # 05 Y:2009 05 2009 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $14,600 $12,400 Not Implemented
UF0425 # 04 Y:2009 04 2009 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $6,908 $1,600 Implemented
UF0425 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $61,944 $21,313 Implemented
UF0425 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,129 $456 Implemented
UF0425 # 01 Y:2009 01 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,286 $0 Not Implemented