IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0435 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,247 $18,650 Implemented
UF0435 # 01 Y:2010 01 2010 INSTALL OCCUPANCY SENSORS $60,031 $5,388 Not Implemented
MI0195 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $61,715 $106,284 Not Implemented
MI0195 # 02 Y:2010 02 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $50,578 $6,600 Implemented
MI0195 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,044 $1,210 Implemented
MI0195 # 04 Y:2010 04 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $8,854 $2,300 Implemented
MI0195 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,905 $40 Implemented
MI0194 # 01 Y:2010 01 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $75,044 $1,800 Not Implemented
MI0194 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $63,336 $80,304 Implemented
MI0194 # 03 Y:2010 03 2010 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $32,237 $65,613 Not Implemented
MI0194 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,923 $1,210 Implemented
MI0194 # 05 Y:2010 05 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,899 $3,903 Not Implemented
MI0194 # 06 Y:2010 06 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,190 $2,000 Implemented
MI0193 # 02 Y:2010 02 2010 HEAT WATER WITH EXHAUST HEAT $100,762 $23,000 Implemented
MI0193 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,000 $1,210 Implemented
MI0193 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,004 $40 Implemented
MI0193 # 06 Y:2010 06 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $6,565 $4,531 Not Implemented
MI0193 # 07 Y:2010 07 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,182 $1,750 Implemented
MI0193 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $58,162 $63,083 Implemented
MI0193 # 01 Y:2010 01 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $159,261 $64,000 Not Implemented
UF0434 # 13 Y:2010 13 2010 CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS $1,875 $10,480 Not Implemented
UF0434 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,388 $0 Not Implemented
UF0434 # 15 Y:2010 15 2010 RECYCLE FLUORESCENT LAMPS $571 $3,405 Not Implemented
UF0434 # 08 Y:2010 08 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,980 $881 Not Implemented
UF0434 # 09 Y:2010 09 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,310 $20,000 Not Implemented