IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

252

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0584 # 08 Y:2022 08 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,261 $3,420 Not Implemented
UF0584 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,855 $40,432 Implemented
UF0584 # 06 Y:2022 06 2022 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $10,226 $7,600 Not Implemented
UF0584 # 05 Y:2022 05 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $10,250 $160 Not Implemented
UF0584 # 04 Y:2022 04 2022 LOWER CEILING TO REDUCE CONDITIONED SPACE $56,623 $65,000 Not Implemented
UF0584 # 03 Y:2022 03 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $57,843 $55,197 Not Implemented
UF0584 # 02 Y:2022 02 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $73,209 $322,608 Not Implemented
UF0584 # 01 Y:2022 01 2022 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $544,931 $1,699,000 Not Implemented
UF0583 # 06 Y:2022 06 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $58,774 $10,000 Not Implemented
UF0583 # 05 Y:2022 05 2022 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $273,973 $0 Not Implemented
UF0583 # 01 Y:2022 01 2022 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $308,276 $1,243,750 Implemented
UF0583 # 02 Y:2022 02 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $44,987 $62,001 Implemented
UF0583 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,746 $33,000 Implemented
UF0583 # 04 Y:2022 04 2022 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $13,240 $0 Implemented
MI0410 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,361 $10,695 Implemented
MI0410 # 01 Y:2022 01 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $11,438 $580 Implemented
MI0410 # 06 Y:2022 06 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $2,493 $140 Implemented
MI0410 # 05 Y:2022 05 2022 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $3,575 $597 Implemented
MI0410 # 04 Y:2022 04 2022 USE SOLAR HEAT TO HEAT WATER $3,955 $18,399 Not Implemented
MI0410 # 03 Y:2022 03 2022 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $5,890 $80 Not Implemented
MI0410 # 02 Y:2022 02 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $7,151 $7,280 Implemented
MI0410 # 08 Y:2022 08 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,073 $2,150 Not Implemented
MI0409 # 05 Y:2022 05 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,094 $1,885 Implemented
MI0409 # 04 Y:2022 04 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,496 $240 Not Implemented
MI0409 # 06 Y:2022 06 2022 INSTALL OCCUPANCY SENSORS $235 $700 Implemented