Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
119
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0461 # 01 Y:2025 | 01 | 2025 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $7,156 | $0 | n/a |
MI0461 # 02 Y:2025 | 02 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,685 | $0 | n/a |
MI0461 # 04 Y:2025 | 04 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,684 | $2,240 | n/a |
MI0461 # 05 Y:2025 | 05 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $6,646 | $33,112 | n/a |
MI0461 # 03 Y:2025 | 03 | 2025 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,724 | $1,840 | n/a |
UF0634 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,705 | $4,689 | n/a |
UF0634 # 08 Y:2025 | 08 | 2025 | IMPROVE SPACE COMFORT CONDITIONING | $22,260 | $2,620 | n/a |
UF0634 # 06 Y:2025 | 06 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $583 | $0 | n/a |
UF0634 # 05 Y:2025 | 05 | 2025 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,037 | $1,677 | n/a |
UF0634 # 02 Y:2025 | 02 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $19,463 | $60,000 | n/a |
UF0634 # 07 Y:2025 | 07 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $326 | $1,500 | n/a |
UF0634 # 04 Y:2025 | 04 | 2025 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $9,396 | $25,300 | n/a |
UF0634 # 01 Y:2025 | 01 | 2025 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $45,476 | $12,413 | n/a |
UF0633 # 02 Y:2025 | 02 | 2025 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $8,823 | $24,000 | n/a |
UF0633 # 06 Y:2025 | 06 | 2025 | IMPROVE COMBUSTION CONTROL CAPABILITY | $3,565 | $2,000 | n/a |
UF0633 # 04 Y:2025 | 04 | 2025 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $4,430 | $3,080 | n/a |
UF0633 # 11 Y:2025 | 11 | 2025 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $505 | $0 | n/a |
UF0633 # 09 Y:2025 | 09 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $630 | $2,500 | n/a |
UF0633 # 10 Y:2025 | 10 | 2025 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $4,240 | $15,000 | n/a |
UF0633 # 08 Y:2025 | 08 | 2025 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $684 | $2,120 | n/a |
UF0633 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,339 | $26,170 | n/a |
UF0633 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $42,561 | $322,608 | n/a |
UF0633 # 05 Y:2025 | 05 | 2025 | IMPROVE COMBUSTION CONTROL CAPABILITY | $3,565 | $8,000 | n/a |
UF0633 # 07 Y:2025 | 07 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,970 | $8,200 | n/a |
UF0632 # 09 Y:2025 | 09 | 2025 | INSTALL TURBULATORS | $2,277 | $3,750 | n/a |