IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

559

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0206 # 03 Y:1984 03 1984 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $14,224 $9,000 Implemented
GT0209 # 01 Y:1984 01 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,600 $500 Implemented
GT0209 # 08 Y:1984 08 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,672 $5,000 Implemented
GT0208 # 01 Y:1984 01 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,150 $1,550 Implemented
GT0208 # 02 Y:1984 02 1984 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,482 $6,948 Implemented
GT0208 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,580 $5,660 Implemented
GT0208 # 04 Y:1984 04 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,720 $0 Implemented
GT0208 # 05 Y:1984 05 1984 REDESIGN PROCESS $10,210 $20,000 Implemented
GT0208 # 06 Y:1984 06 1984 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $18,300 $20,000 Implemented
GT0201 # 01 Y:1983 01 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,132 $500 Implemented
GT0201 # 02 Y:1983 02 1983 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $28,745 $50,000 Implemented
GT0201 # 03 Y:1983 03 1983 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $22,837 $10,000 Implemented
GT0201 # 04 Y:1983 04 1983 MODIFY DYE BECK $58,597 $101,000 Implemented
GT0201 # 05 Y:1983 05 1983 MODIFY DYE BECK $38,740 $51,000 Implemented
GT0201 # 06 Y:1983 06 1983 MODIFY TEXTILE DRYERS $33,809 $35,000 Implemented
GT0201 # 07 Y:1983 07 1983 CONTROL PRESSURE ON STEAMER OPERATIONS $7,770 $3,500 Implemented
GT0201 # 08 Y:1983 08 1983 REPAIR AND ELIMINATE STEAM LEAKS $4,897 $400 Implemented
GT0201 # 09 Y:1983 09 1983 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,028 $4,000 Implemented
GT0201 # 10 Y:1983 10 1983 USE DEMAND CONTROLLER OR LOAD SHEDDER $27,900 $50,000 Implemented
GT0187 # 02 Y:1983 02 1983 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,977 $22,034 Implemented
GT0187 # 03 Y:1983 03 1983 MODIFY DYE BECK $1,338 $600 Implemented
GT0187 # 04 Y:1983 04 1983 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $14,618 $24,000 Implemented
GT0180 # 01 Y:1983 01 1983 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $4,000 $62,500 Implemented
GT0180 # 02 Y:1983 02 1983 REDUCE GLAZED AREAS IN BUILDINGS $990 $350 Implemented
GT0180 # 03 Y:1983 03 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,220 $7,510 Implemented