IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

232

matching recommendations
Reset
SIC 2281 Yarn Spinning Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0521 # 02 Y:1994 02 1994 DISCONNECT BALLASTS $360 $640 Implemented
GT0521 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,620 $17,130 Implemented
GT0521 # 04 Y:1994 04 1994 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $580 $1,920 Not Implemented
GT0521 # 05 Y:1994 05 1994 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $6,070 $4,600 Not Implemented
GT0521 # 06 Y:1994 06 1994 USE MINIMUM STEAM OPERATING PRESSURE $200 $0 Implemented
GT0521 # 07 Y:1994 07 1994 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,770 $13,000 Not Implemented
GT0521 # 08 Y:1994 08 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $890 $900 Implemented
GT0521 # 09 Y:1994 09 1994 REPAIR AND ELIMINATE STEAM LEAKS $11,670 $700 Implemented
GT0515 # 01 Y:1993 01 1993 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $4,130 $9,570 Not Implemented
GT0515 # 02 Y:1993 02 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,090 $0 Not Implemented
GT0515 # 03 Y:1993 03 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $680 $500 Implemented
GT0515 # 04 Y:1993 04 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,260 $14,500 Not Implemented
GT0515 # 05 Y:1993 05 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $48,620 $100,640 Not Implemented
GT0515 # 06 Y:1993 06 1993 RECOVER WASTE HEAT FROM EQUIPMENT $45,330 $32,700 Not Implemented
GT0515 # 07 Y:1993 07 1993 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $8,650 $6,560 Not Implemented
GT0515 # 08 Y:1993 08 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,820 $80,090 Implemented
GT0427 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,000 $3,987 Implemented
GT0427 # 02 Y:1991 02 1991 IMPROVE LUBRICATION PRACTICES $1,060 $0 Implemented
GT0427 # 03 Y:1991 03 1991 RECOVER AND REUSE COOLING WATER $8,140 $11,000 Implemented
GT0427 # 05 Y:1991 05 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,280 $2,000 Implemented
GT0401 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,050 $34,920 Implemented
GT0401 # 02 Y:1990 02 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,814 $4,225 Not Implemented
GT0401 # 03 Y:1990 03 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,615 $8,720 Implemented
GT0401 # 04 Y:1990 04 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,565 $200 Implemented
GT0401 # 05 Y:1990 05 1990 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,600 $5,000 Implemented