IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0564 # 02 Y:1995 02 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $15,232 $12,982 Not Implemented
GT0564 # 03 Y:1995 03 1995 REPAIR AND ELIMINATE STEAM LEAKS $9,071 $1,100 Implemented
GT0564 # 04 Y:1995 04 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $240 $67 Implemented
GT0564 # 05 Y:1995 05 1995 INCREASE AMOUNT OF CONDENSATE RETURNED $58,800 $14,000 Implemented
GT0564 # 06 Y:1995 06 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $77,400 $750 Implemented
GT0564 # 07 Y:1995 07 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $990 $50 Not Implemented
GT0564 # 08 Y:1995 08 1995 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $22,200 $0 Implemented
GT0564 # 09 Y:1995 09 1995 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $102,300 $85,000 Not Implemented
GT0564 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $65,300 $424,200 Implemented
UF0122 # 07 Y:1995 07 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $593 $500 Implemented
UF0122 # 06 Y:1995 06 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,796 $5,186 Implemented
UF0122 # 05 Y:1995 05 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $870 $1,000 Implemented
UF0122 # 04 Y:1995 04 1995 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $724 $2,600 Not Implemented
UF0122 # 03 Y:1995 03 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,452 $400 Not Implemented
UF0122 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,775 $5,159 Not Implemented
UF0122 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,779 $5,399 Implemented
GT0548 # 02 Y:1995 02 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $100 $140 Implemented
GT0548 # 03 Y:1995 03 1995 USE SYNTHETIC LUBRICANT $1,530 $3,400 Implemented
GT0548 # 04 Y:1995 04 1995 RECOVER AND REUSE WASTE MATERIAL $6,960 $0 Implemented
GT0548 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,060 $350 Implemented
GT0570 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $690 $1,370 Not Implemented
GT0570 # 05 Y:1995 05 1995 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $113,700 $200,000 Not Implemented
GT0570 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $890 $3,980 Not Implemented
GT0570 # 03 Y:1995 03 1995 REPAIR AND ELIMINATE STEAM LEAKS $1,850 $300 Implemented
GT0570 # 02 Y:1995 02 1995 USE HEAT EXCHANGE FLUIDS INSTEAD OF STEAM IN PIPELINE TRACING SYSTEMS $3,045 $3,100 Implemented