IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0659 # 06 Y:1999 06 1999 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $45,013 $120,000 n/a
GT0659 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,706 $22,711 n/a
GT0659 # 01 Y:1999 01 1999 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $88,180 $220,000 n/a
GT0659 # 02 Y:1999 02 1999 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $3,484 $0 n/a
GT0659 # 03 Y:1999 03 1999 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $37,040 $10,000 n/a
GT0659 # 04 Y:1999 04 1999 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $3,123 $400 n/a
GT0678 # 08 Y:1999 08 1999 COMBINE UTILITY METERS $7,560 $7,500 Not Implemented
GT0678 # 07 Y:1999 07 1999 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $44,185 $120,000 Not Implemented
GT0678 # 06 Y:1999 06 1999 TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS $35,980 $0 Implemented
GT0678 # 05 Y:1999 05 1999 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,447 $21,000 Not Implemented
GT0678 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,400 $0 Not Implemented
GT0678 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,880 $3,500 Not Implemented
GT0678 # 02 Y:1999 02 1999 REDUCE EXCESSIVE BOILER BLOWDOWN $920 $900 Not Implemented
GT0678 # 01 Y:1999 01 1999 METER WASTE WATER $4,925 $900 Implemented
GT0657 # 10 Y:1999 10 1999 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $13,410 $2,400 n/a
GT0657 # 09 Y:1999 09 1999 USE A RAG RECYCLE SERVICE $65,262 $0 n/a
GT0657 # 08 Y:1999 08 1999 $94,225 $35,250 n/a
GT0657 # 07 Y:1999 07 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,617 $25,504 n/a
GT0657 # 06 Y:1999 06 1999 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,779 $400 n/a
GT0657 # 05 Y:1999 05 1999 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,997 $160 n/a
GT0657 # 04 Y:1999 04 1999 CONVERT TO ELECTROSTATIC POWDER COATING $23,418 $1,000 n/a
GT0657 # 03 Y:1999 03 1999 METER WASTE WATER $2,793 $200 n/a
GT0657 # 02 Y:1999 02 1999 USE DEMAND CONTROLLER OR LOAD SHEDDER $12,270 $5,000 n/a
GT0657 # 01 Y:1999 01 1999 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $53,008 $75,650 n/a