IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

214

matching recommendations
Reset
SIC 371 Motor Vehicles And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0533 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $993 $1,342 Implemented
IA0533 # 08 Y:2015 08 2015 INSTALL OCCUPANCY SENSORS $597 $2,226 Not Implemented
IA0533 # 06 Y:2015 06 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,994 $4,066 Implemented
IA0533 # 05 Y:2015 05 2015 RECOVER WASTE HEAT FROM EQUIPMENT $2,294 $2,575 Not Implemented
IA0533 # 04 Y:2015 04 2015 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,136 $210 Implemented
IA0533 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,225 $7,848 Implemented
IA0533 # 02 Y:2015 02 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,005 $1,049 Implemented
IA0533 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,857 $19,775 Implemented
IA0449 # 06 Y:2010 06 2010 INSULATE BARE EQUIPMENT $5,734 $1,910 Implemented
IA0449 # 01 Y:2010 01 2010 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $13,384 $500 Not Implemented
IA0449 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,171 $500 Implemented
IA0449 # 03 Y:2010 03 2010 RECOVER WASTE HEAT FROM EQUIPMENT $2,181 $650 Implemented
IA0449 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,025 $28,980 Implemented
IA0449 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $229 $1,199 Implemented
IA0449 # 07 Y:2010 07 2010 COVER OPEN TANKS $8,215 $6,350 Not Implemented
IA0437 # 03 Y:2009 03 2009 INSTALL SPECTRAL REFLECTORS / DELAMP $2,046 $228 Implemented
IA0437 # 07 Y:2009 07 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,416 $500 Not Implemented
IA0437 # 04 Y:2009 04 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $13,962 $2,381 Implemented
IA0437 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,135 $31,226 Implemented
IA0437 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $78,974 $329,643 Implemented
IA0437 # 09 Y:2009 09 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $986 $216 Implemented
IA0437 # 10 Y:2009 10 2009 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $7,336 $7,337 Not Implemented
IA0437 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,846 $114,679 Implemented
IA0437 # 06 Y:2009 06 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,380 $626 Implemented
IA0437 # 08 Y:2009 08 2009 RECOVER WASTE HEAT FROM EQUIPMENT $4,190 $1,045 Implemented