Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
30
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0297 # 08 Y:1989 | 08 | 1989 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $581 | $350 | Implemented |
KU0297 # 07 Y:1989 | 07 | 1989 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,339 | $7,000 | Not Implemented |
KU0297 # 06 Y:1989 | 06 | 1989 | TREAT AND REUSE RINSE WATERS | $15,540 | $9,000 | Implemented |
KU0297 # 05 Y:1989 | 05 | 1989 | OPTIMIZE PLANT POWER FACTOR | $7,688 | $13,500 | Implemented |
KU0297 # 04 Y:1989 | 04 | 1989 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $339 | $1,200 | Implemented |
KU0297 # 03 Y:1989 | 03 | 1989 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,843 | $3,200 | Not Implemented |
KU0297 # 02 Y:1989 | 02 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,367 | $0 | Not Implemented |
KU0297 # 01 Y:1989 | 01 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $218 | $119 | Implemented |
KU0293 # 06 Y:1989 | 06 | 1989 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $40,497 | $0 | Not Implemented |
KU0293 # 05 Y:1989 | 05 | 1989 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,638 | $450 | Implemented |
KU0293 # 04 Y:1989 | 04 | 1989 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $345 | $0 | Not Implemented |
KU0293 # 03 Y:1989 | 03 | 1989 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $360 | $41 | Implemented |
KU0293 # 02 Y:1989 | 02 | 1989 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $528 | $130 | Implemented |
KU0293 # 01 Y:1989 | 01 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $227 | $118 | Implemented |
KU0292 # 06 Y:1989 | 06 | 1989 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,284 | $3,144 | Not Implemented |
KU0288 # 01 Y:1989 | 01 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,193 | $500 | Implemented |
KU0292 # 05 Y:1989 | 05 | 1989 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $167 | $120 | Implemented |
KU0292 # 04 Y:1989 | 04 | 1989 | INSTALL SET-BACK TIMERS | $3,496 | $1,000 | Implemented |
KU0292 # 03 Y:1989 | 03 | 1989 | PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT | $591 | $1,350 | Not Implemented |
KU0292 # 02 Y:1989 | 02 | 1989 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $751 | $700 | Not Implemented |
KU0292 # 01 Y:1989 | 01 | 1989 | INSTALL TIMERS AND/OR THERMOSTATS | $10,146 | $800 | Implemented |
KU0289 # 06 Y:1989 | 06 | 1989 | INSTALL SET-BACK TIMERS | $228 | $40 | Implemented |
KU0289 # 05 Y:1989 | 05 | 1989 | LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION | $5,839 | $12,000 | Not Implemented |
KU0289 # 04 Y:1989 | 04 | 1989 | SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM | $6,782 | $7,500 | Not Implemented |
KU0289 # 03 Y:1989 | 03 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,861 | $8,150 | Not Implemented |