Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
111
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0421 # 03 Y:2007 | 03 | 2007 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $950 | $2,575 | Implemented |
IA0421 # 05 Y:2007 | 05 | 2007 | MODIFY STARTUP/SHUTDOWN TIMES | $2,951 | $500 | Implemented |
IA0421 # 04 Y:2007 | 04 | 2007 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,109 | $4,080 | Implemented |
IA0421 # 01 Y:2007 | 01 | 2007 | REPAIR AND ELIMINATE STEAM LEAKS | $5,499 | $675 | Implemented |
IA0421 # 02 Y:2007 | 02 | 2007 | INSULATE BARE EQUIPMENT | $5,635 | $651 | Not Implemented |
IA0421 # 06 Y:2007 | 06 | 2007 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $2,749 | $60 | Implemented |
IA0421 # 07 Y:2007 | 07 | 2007 | IMPROVE COMBUSTION CONTROL CAPABILITY | $1,093 | $1,800 | Implemented |
IA0421 # 08 Y:2007 | 08 | 2007 | MINIMIZE WATER USAGE | $10,056 | $400 | Implemented |
IA0419 # 04 Y:2007 | 04 | 2007 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,431 | $174 | Not Implemented |
IA0419 # 06 Y:2007 | 06 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,515 | $7,460 | Not Implemented |
IA0419 # 08 Y:2007 | 08 | 2007 | OPTIMIZE PLANT POWER FACTOR | $19,032 | $19,062 | Not Implemented |
IA0419 # 07 Y:2007 | 07 | 2007 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,450 | $1,200 | Implemented |
IA0419 # 05 Y:2007 | 05 | 2007 | INSTALL OCCUPANCY SENSORS | $758 | $1,001 | Implemented |
IA0419 # 01 Y:2007 | 01 | 2007 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $4,302 | $1,140 | Not Implemented |
IA0419 # 02 Y:2007 | 02 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $678 | $25 | Implemented |
IA0419 # 03 Y:2007 | 03 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,055 | $500 | Implemented |
IA0419 # 09 Y:2007 | 09 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,583 | $3,300 | Implemented |
IA0419 # 10 Y:2007 | 10 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,325 | $800 | Implemented |
IA0416 # 01 Y:2007 | 01 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,435 | $1,000 | Implemented |
IA0416 # 10 Y:2007 | 10 | 2007 | INSULATE BARE EQUIPMENT | $9,900 | $3,800 | Implemented |
IA0416 # 04 Y:2007 | 04 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,598 | $17,058 | Implemented |
IA0416 # 02 Y:2007 | 02 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,998 | $268 | Implemented |
IA0416 # 09 Y:2007 | 09 | 2007 | INSULATE BARE EQUIPMENT | $6,665 | $1,610 | Implemented |
IA0416 # 03 Y:2007 | 03 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,605 | $17 | Implemented |
IA0416 # 05 Y:2007 | 05 | 2007 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $1,251 | $1,500 | Not Implemented |