Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
906
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0796 # 01 Y:2024 | 01 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $733 | $546 | n/a |
OR0796 # 03 Y:2024 | 03 | 2024 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $584 | $2,239 | n/a |
OR0796 # 04 Y:2024 | 04 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $130,526 | $1,312,500 | n/a |
OR0796 # 02 Y:2024 | 02 | 2024 | ADOPT IN-HOUSE MATERIAL GENERATION | $86,946 | $168,430 | n/a |
UU0252 # 02 Y:2024 | 02 | 2024 | USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS | $53,389 | $212,000 | n/a |
UU0252 # 01 Y:2024 | 01 | 2024 | USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS | $19,754 | $108,000 | n/a |
UU0252 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $1,880 | $5,500 | n/a |
UU0252 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,070 | $4,410 | n/a |
UU0248 # 03 Y:2024 | 03 | 2024 | USE AUTOMATIC FLOW CONTROL | $820 | $4,250 | n/a |
UU0248 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,740 | $1,270 | n/a |
UU0248 # 01 Y:2024 | 01 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $980 | $2,600 | n/a |
UU0248 # 04 Y:2024 | 04 | 2024 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $33,420 | $319,250 | n/a |
UU0248 # 07 Y:2024 | 07 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,570 | $9,360 | n/a |
UU0248 # 05 Y:2024 | 05 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $6,380 | $133,800 | n/a |
UU0248 # 06 Y:2024 | 06 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $940 | $3,000 | n/a |
UU0247 # 02 Y:2024 | 02 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,770 | $9,500 | n/a |
UU0247 # 01 Y:2024 | 01 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,970 | $3,000 | n/a |
UU0247 # 04 Y:2024 | 04 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $1,060 | $1,950 | n/a |
UU0247 # 03 Y:2024 | 03 | 2024 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $200,000 | $717,040 | n/a |
UU0247 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $864 | $7,540 | n/a |
UU0235 # 03 Y:2024 | 03 | 2024 | INSULATE BARE EQUIPMENT | $12,478 | $23,282 | Not Implemented |
UU0235 # 02 Y:2024 | 02 | 2024 | USE STEAM SPARGING OR INJECTIONS IN PLACE OF INDIRECT HEATING | $271,861 | $3,050,000 | Not Implemented |
UU0235 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,664 | $1,013 | Implemented |
UU0235 # 04 Y:2024 | 04 | 2024 | USE OPTIMUM THICKNESS INSULATION | $6,968 | $8,826 | Not Implemented |
UU0236 # 02 Y:2024 | 02 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $72,320 | $46,000 | Implemented |