IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

886

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0103 # 08 Y:2017 08 2017 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $222,139 $1,220,494 Not Implemented
BS0103 # 09 Y:2017 09 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,633 $246 Not Implemented
BS0103 # 10 Y:2017 10 2017 RECOVER WASTE HEAT FROM EQUIPMENT $1,420 $4,153 Not Implemented
BS0102 # 01 Y:2017 01 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $7,306 $495 Implemented
BS0102 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,159 $10,362 Implemented
BS0102 # 03 Y:2017 03 2017 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,991 $1,301 Not Implemented
BS0102 # 04 Y:2017 04 2017 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $194 $682 Not Implemented
BS0102 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,365 $734 Implemented
BS0102 # 06 Y:2017 06 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $436 $672 Implemented
BS0102 # 07 Y:2017 07 2017 INSTALL OCCUPANCY SENSORS $91 $85 Not Implemented
BS0102 # 08 Y:2017 08 2017 PAY UTILITY BILLS ON TIME $874 $144 Implemented
BS0101 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,063 $41,435 Not Implemented
BS0101 # 02 Y:2017 02 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,143 $525 Not Implemented
BS0101 # 03 Y:2017 03 2017 OPTIMIZE PLANT POWER FACTOR $10,844 $25,166 Not Implemented
BS0101 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,138 $1,400 Not Implemented
BS0101 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $261 $660 Not Implemented
BS0101 # 06 Y:2017 06 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,830 $20,375 Not Implemented
BS0100 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,619 $437 Not Implemented
BS0100 # 02 Y:2017 02 2017 ELIMINATE/REDUCE AN OPERATION $247 $89 Not Implemented
BS0100 # 03 Y:2017 03 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $703 $90 Not Implemented
BS0100 # 04 Y:2017 04 2017 INSTALL OCCUPANCY SENSORS $284 $39 Not Implemented
BS0100 # 05 Y:2017 05 2017 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $640 $8 Not Implemented
BS0100 # 06 Y:2017 06 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $80 $100 Not Implemented
BS0100 # 07 Y:2017 07 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,572 $14,699 Not Implemented
BS0100 # 08 Y:2017 08 2017 RECOVER WASTE HEAT FROM EQUIPMENT $488 $564 Not Implemented