Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
47
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0143 # 03 Y:2020 | 03 | 2020 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $68,374 | $200,000 | Not Implemented |
BS0143 # 02 Y:2020 | 02 | 2020 | INSTALL OCCUPANCY SENSORS | $11 | $25 | Not Implemented |
BS0143 # 01 Y:2020 | 01 | 2020 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $36,379 | $1,225,000 | Not Implemented |
BS0142 # 05 Y:2020 | 05 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $888 | $1,944 | Not Implemented |
BS0142 # 04 Y:2020 | 04 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $53 | $75 | Not Implemented |
BS0142 # 03 Y:2020 | 03 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,266 | $1,811 | Not Implemented |
BS0142 # 02 Y:2020 | 02 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,550 | $6,370 | Not Implemented |
BS0142 # 01 Y:2020 | 01 | 2020 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,675 | $335 | Not Implemented |
BS0141 # 03 Y:2020 | 03 | 2020 | INSTALL OCCUPANCY SENSORS | $68 | $55 | Not Implemented |
BS0141 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,094 | $50 | Not Implemented |
BS0141 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $903 | $3,300 | Not Implemented |
BS0141 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,521 | $1,100 | Not Implemented |
BS0141 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,407 | $70,150 | Not Implemented |
BS0141 # 06 Y:2020 | 06 | 2020 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $36,736 | $27,300 | Not Implemented |
BS0140 # 06 Y:2020 | 06 | 2020 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $479 | $1,149 | Not Implemented |
BS0140 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,475 | $2,808 | Not Implemented |
BS0140 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,837 | $642 | Implemented |
BS0140 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,058 | $0 | Implemented |
BS0140 # 02 Y:2020 | 02 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $466 | $319 | Implemented |
BS0140 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,952 | $4,513 | Implemented |
BS0137 # 03 Y:2020 | 03 | 2020 | UPGRADE OBSOLETE EQUIPMENT | $4,702 | $21,000 | Not Implemented |
BS0137 # 06 Y:2020 | 06 | 2020 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $14,705 | $45,023 | Not Implemented |
BS0137 # 05 Y:2020 | 05 | 2020 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $13,551 | $13,500 | Not Implemented |
BS0137 # 04 Y:2020 | 04 | 2020 | INSTALL OCCUPANCY SENSORS | $1,055 | $1,765 | Not Implemented |
BS0137 # 02 Y:2020 | 02 | 2020 | REDUCE VENTILATION AIR | $2,625 | $7,998 | Not Implemented |