IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0063 # 04 Y:2015 04 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,150 $1,124 Implemented
BS0063 # 03 Y:2015 03 2015 INSTALL OCCUPANCY SENSORS $143 $357 Implemented
BS0063 # 02 Y:2015 02 2015 RECOVER WASTE HEAT FROM EQUIPMENT $7,981 $3,759 Not Implemented
BS0063 # 07 Y:2015 07 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,883 $503 Implemented
BS0063 # 05 Y:2015 05 2015 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $3,476 $12,265 Implemented
BS0063 # 01 Y:2015 01 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $260 $208 Implemented
BS0062 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $629 $15 Implemented
BS0062 # 04 Y:2015 04 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,584 $3,035 Not Implemented
BS0062 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $703 $447 Implemented
BS0062 # 02 Y:2015 02 2015 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $450 $661 Not Implemented
BS0062 # 01 Y:2015 01 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $6,803 $1,125 Not Implemented
BS0060 # 04 Y:2015 04 2015 RECOVER WASTE HEAT FROM EQUIPMENT $1,359 $2,116 Not Implemented
BS0060 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $674 $1,555 Not Implemented
BS0060 # 02 Y:2015 02 2015 OPTIMIZE PLANT POWER FACTOR $8,556 $17,382 Not Implemented
BS0060 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $479 $156 Not Implemented
BS0060 # 03 Y:2015 03 2015 INSTALL OCCUPANCY SENSORS $294 $272 Implemented
BS0060 # 06 Y:2015 06 2015 UPGRADE CONTROLS ON COMPRESSORS $8,893 $26,927 Not Implemented
BS0060 # 07 Y:2015 07 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $11,499 $5,813 Not Implemented
BS0060 # 08 Y:2015 08 2015 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $6,056 $1,870 Not Implemented
BS0059 # 02 Y:2015 02 2015 UPGRADE CONTROLS ON COMPRESSORS $5,532 $1,105 Not Implemented
BS0059 # 03 Y:2015 03 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,254 $526 Implemented
BS0059 # 04 Y:2015 04 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $744 $264 Not Implemented
BS0059 # 05 Y:2015 05 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,386 $9,729 Implemented
BS0059 # 07 Y:2015 07 2015 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $368 $4,065 Not Implemented
BS0059 # 08 Y:2015 08 2015 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $25 $929 Not Implemented