IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

39

matching recommendations
Reset
NAICS 3222 Converted Paper Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0102 # 01 Y:2005 01 2005 MOVE BOILER TO MORE EFFICIENT LOCATION $39,466 $3,500 Not Implemented
IC0102 # 13 Y:2005 13 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,019 $220 Not Implemented
IC0102 # 12 Y:2005 12 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,208 $5,000 Not Implemented
IC0102 # 11 Y:2005 11 2005 CHECK FOR ACCURACY OF UTILITY / POWER METERS $10,135 $10,152 Not Implemented
IC0102 # 10 Y:2005 10 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $24,250 $52,000 Not Implemented
IC0102 # 09 Y:2005 09 2005 KEEP BOILER TUBES CLEAN $3,862 $776 Not Implemented
IC0102 # 08 Y:2005 08 2005 CLOSE OFF UNNEEDED STEAM LINES $329 $384 Not Implemented
IC0102 # 07 Y:2005 07 2005 INSTALL STEAM TRAP $542 $2,142 Not Implemented
IC0102 # 06 Y:2005 06 2005 INCREASE AMOUNT OF CONDENSATE RETURNED $1,738 $1,200 Not Implemented
IC0102 # 05 Y:2005 05 2005 REPAIR AND ELIMINATE STEAM LEAKS $16,902 $2,200 Not Implemented
IC0102 # 04 Y:2005 04 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,597 $0 Not Implemented
IC0102 # 03 Y:2005 03 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $9,426 $6,213 Not Implemented
IC0102 # 02 Y:2005 02 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,439 $54,000 Not Implemented
IC0102 # 14 Y:2005 14 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,924 $2,500 Not Implemented
IC0102 # 15 Y:2005 15 2005 UPGRADE CONTROLS ON COMPRESSORS $669 $168 Not Implemented
IC0102 # 16 Y:2005 16 2005 DISCONNECT BALLASTS $29,539 $2,208 Not Implemented
BD0288 # 12 Y:2005 12 2005 INSTALL OCCUPANCY SENSORS $677 $375 Implemented
BD0288 # 11 Y:2005 11 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,154 $2,480 Not Implemented
BD0288 # 09 Y:2005 09 2005 RECOVER WASTE HEAT FROM EQUIPMENT $712 $1,000 Not Implemented
BD0288 # 08 Y:2005 08 2005 REPAIR AND ELIMINATE STEAM LEAKS $2,844 $2,400 Implemented
BD0288 # 06 Y:2005 06 2005 USE SYNTHETIC LUBRICANT $536 $550 Implemented
BD0288 # 05 Y:2005 05 2005 IMPROVE COMBUSTION CONTROL CAPABILITY $5,194 $2,000 Implemented
BD0288 # 04 Y:2005 04 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,812 $900 Implemented
BD0288 # 03 Y:2005 03 2005 REPLACE BOILER $14,342 $2,500 Implemented
BD0288 # 02 Y:2005 02 2005 USE RADIANT HEATER FOR SPOT HEATING $13,106 $12,800 Not Implemented