IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0191 # 07 Y:1993 07 1993 INSTALL OCCUPANCY SENSORS $403 $525 Implemented
WI0191 # 05 Y:1993 05 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $959 $500 Implemented
WI0191 # 04 Y:1993 04 1993 OPERATE BOILERS ON HIGH FIRE SETTING $1,499 $0 Implemented
WI0191 # 01 Y:1993 01 1993 COVER OPEN TANKS $2,679 $600 Implemented
WI0191 # 08 Y:1993 08 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $165 $301 Implemented
IA0064 # 03 Y:1993 03 1993 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $13,920 $6,676 Implemented
IA0064 # 01 Y:1993 01 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $33,534 $4,388 Implemented
IA0064 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,322 $2,500 Implemented
IA0064 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,740 $2,585 Implemented
IA0064 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $297 $0 Implemented
WI0187 # 08 Y:1993 08 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $387 $120 Implemented
WI0187 # 03 Y:1993 03 1993 INSULATE BARE EQUIPMENT $278 $40 Implemented
WI0187 # 02 Y:1993 02 1993 INSULATE BARE EQUIPMENT $343 $184 Implemented
WI0187 # 01 Y:1993 01 1993 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,534 $750 Implemented
WI0185 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,556 $2,336 Implemented
WI0185 # 05 Y:1993 05 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,295 $0 Implemented
WI0185 # 02 Y:1993 02 1993 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,773 $0 Implemented
WI0180 # 12 Y:1993 12 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $498 $500 Implemented
WI0180 # 10 Y:1993 10 1993 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,494 $0 Implemented
WI0180 # 06 Y:1993 06 1993 INSULATE BARE EQUIPMENT $2,007 $51 Implemented
WI0180 # 05 Y:1993 05 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,804 $18,262 Implemented
WI0180 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,508 $6,708 Implemented
WI0180 # 03 Y:1993 03 1993 INSTALL OCCUPANCY SENSORS $9,793 $3,450 Implemented
WI0180 # 01 Y:1993 01 1993 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $17,501 $0 Implemented
WI0175 # 04 Y:1993 04 1993 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,672 $4,650 Implemented