Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
502
matching recommendationsSIC | 36 | Electronic & Other Electric Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0244 # 04 Y:2020 | 04 | 2020 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,190 | $6,120 | Not Implemented |
IC0245 # 05 Y:2020 | 05 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $23,890 | $13,698 | Implemented |
IC0245 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,465 | $4,250 | Implemented |
IC0241 # 04 Y:2020 | 04 | 2020 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $7,230 | $0 | Implemented |
IC0241 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,437 | $2,557 | Implemented |
IC0241 # 06 Y:2020 | 06 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,521 | $4,105 | Implemented |
IC0241 # 07 Y:2020 | 07 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $520 | $210 | Not Implemented |
IC0241 # 05 Y:2020 | 05 | 2020 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $4,157 | $12,984 | Implemented |
IC0241 # 08 Y:2020 | 08 | 2020 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $128,857 | $36,950 | Implemented |
IC0241 # 03 Y:2020 | 03 | 2020 | PAY BILLS ON TIME TO AVOID LATE FEES | $5,410 | $0 | Implemented |
IC0241 # 02 Y:2020 | 02 | 2020 | BURN WOOD BY-PRODUCTS FOR HEAT | $4,694 | $9,522 | Not Implemented |
IP0109 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,107 | $59 | Implemented |
IP0109 # 05 Y:2018 | 05 | 2018 | INSTALL OCCUPANCY SENSORS | $1,506 | $1,246 | Not Implemented |
IP0109 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $30,301 | $51,647 | Implemented |
IP0109 # 03 Y:2018 | 03 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $19,901 | $2,251 | Not Implemented |
IP0109 # 01 Y:2018 | 01 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $8,423 | $0 | Implemented |
IP0109 # 06 Y:2018 | 06 | 2018 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,342 | $5,885 | Implemented |
IP0109 # 07 Y:2018 | 07 | 2018 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $44,448 | $205,000 | Not Implemented |
WM0124 # 05 Y:2018 | 05 | 2018 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,404 | $405 | Not Implemented |
WM0124 # 14 Y:2018 | 14 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $80 | $340 | Not Implemented |
WM0124 # 06 Y:2018 | 06 | 2018 | USE SYNTHETIC LUBRICANT | $1,387 | $1,710 | Implemented |
WM0124 # 07 Y:2018 | 07 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,363 | $700 | Not Implemented |
WM0124 # 15 Y:2018 | 15 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $57 | $0 | Implemented |
WM0124 # 13 Y:2018 | 13 | 2018 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $137 | $0 | Not Implemented |
WM0124 # 10 Y:2018 | 10 | 2018 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $291 | $740 | Not Implemented |