IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

251

matching recommendations
Reset
SIC 39 Miscellaneous Manufacturing Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0053 # 07 Y:1996 07 1996 RECOVER AND REUSE COOLING WATER $1,645 $2,818 Not Implemented
WI0252 # 01 Y:1995 01 1995 INSTALL OCCUPANCY SENSORS $2,689 $975 Not Implemented
WI0252 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,268 $6,300 Not Implemented
WI0252 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,571 $2,665 Not Implemented
WI0252 # 04 Y:1995 04 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $786 $0 Implemented
WI0252 # 05 Y:1995 05 1995 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,698 $5,500 Not Implemented
WI0252 # 06 Y:1995 06 1995 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $690 $1,000 Not Implemented
WI0252 # 07 Y:1995 07 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $371 $800 Not Implemented
WI0252 # 08 Y:1995 08 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $125 $30 Implemented
WI0252 # 09 Y:1995 09 1995 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $911 $4,200 Not Implemented
WI0252 # 10 Y:1995 10 1995 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $543 $525 Not Implemented
WI0218 # 01 Y:1994 01 1994 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,760 $8,532 Implemented
WI0218 # 02 Y:1994 02 1994 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS $7,498 $0 Implemented
WI0218 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,927 $4,569 Not Implemented
WI0218 # 04 Y:1994 04 1994 INSTALL OCCUPANCY SENSORS $518 $300 Not Implemented
WI0218 # 05 Y:1994 05 1994 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $1,260 $1,000 Not Implemented
WI0218 # 06 Y:1994 06 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,148 $500 Implemented
WI0218 # 07 Y:1994 07 1994 RECOVER WASTE HEAT FROM EQUIPMENT $663 $500 Not Implemented
WI0218 # 08 Y:1994 08 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,007 $1,980 Not Implemented
WI0213 # 01 Y:1994 01 1994 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS $4,449 $0 Implemented
WI0213 # 02 Y:1994 02 1994 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,383 $2,000 Implemented
WI0213 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,758 $4,000 Not Implemented
WI0213 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $669 $1,713 Implemented
WI0213 # 05 Y:1994 05 1994 INSTALL OCCUPANCY SENSORS $663 $600 Implemented
WI0213 # 06 Y:1994 06 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,597 $1,000 Not Implemented