Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 1996
Principal Product Advertising Products
NAICS n/a
SIC 3993 - Signs And Advertising Specialities
Sales $10,000,000-$50,000,000
# of Employees 182
Plant Area (Sq.Ft.) 50,000
Annual Production 0 Units
Production Hrs. Annual 4,992
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $84,551 1,478,605 kWh $0.06
Electricity Demand $12,414 5,297 kW-months/year $2.34
Electricity Fees $1,851 - $ -
Natural Gas $6,438 1,639 MMBtu $3.93
TOTAL ENERGY COSTS $117,274
RECOMMENDED SAVINGS* $13,873 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ lb $ $ $ $ $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,436
Cost:
$2,827
$1,251 31,946 $185 79 - - - - - - - - $1,251
31,946
kWh
$185
79
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
Tgal
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,149
Cost:
$1,149
$1,071 27,550 $78 33 - - - - - - - - $1,071
27,550
kWh
$78
33
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
Tgal
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,102
Cost:
$2,530
$986 25,205 $116 49 - - - - - - - - $986
25,205
kWh
$116
49
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
Tgal
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$572
Cost:
$750
$473 12,016 $99 42 - - - - - - - - $473
12,016
kWh
$99
42
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
Tgal
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$482
Cost:
$750
$439 11,137 $43 18 - - - - - - - - $439
11,137
kWh
$43
18
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
Tgal
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$7,487
Cost:
$6,500
- - - - $1,353 79,800 $(-250) - $6,384 - - - -
-
kWh
-
-
kW-months/year
$1,353
79,800
lb
$(-250)
-
$
$6,384
-
$
-
-
Tgal
07: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$1,645
Cost:
$2,818
$(-200) (-4,982) - - - - - - - - $1,845 - $(-200)
(-4,982)
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
$1,845
-
Tgal
TOTAL RECOMMENDED Savings:
$13,873
Cost:
$17,324
$4,020 102,872 $521 221 $1,353 79,800 $(-250) - $6,384 - $1,845 - $4,020
102,872
kWh
$521
221
kW-months/year
$1,353
79,800
lb
$(-250)
-
$
$6,384
-
$
$1,845
-
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Water Consumption