IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

434

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0222 # 09 Y:2002 09 2002 INSULATE BARE EQUIPMENT $1,141 $1,018 Not Implemented
BD0222 # 13 Y:2002 13 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $70,000 $40,000 Implemented
BD0222 # 06 Y:2002 06 2002 INSTALL TURBULATORS $2,272 $3,500 Not Implemented
BD0222 # 02 Y:2002 02 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,898 $12,020 Implemented
BD0222 # 12 Y:2002 12 2002 REPAIR AND ELIMINATE STEAM LEAKS $126 $100 Not Implemented
BD0222 # 04 Y:2002 04 2002 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $6,079 $6,000 Not Implemented
BD0222 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,027 $1,000 Not Implemented
BD0222 # 10 Y:2002 10 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $652 $0 Not Implemented
BD0222 # 08 Y:2002 08 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,901 $2,000 Not Implemented
BD0222 # 07 Y:2002 07 2002 INSTALL OCCUPANCY SENSORS $2,219 $1,425 Not Implemented
BD0222 # 01 Y:2002 01 2002 SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM $185,274 $20,000 Not Implemented
BD0222 # 15 Y:2002 15 2002 PAY BILLS ON TIME TO AVOID LATE FEES $2,004 $0 Not Implemented
BD0222 # 14 Y:2002 14 2002 AUTOMATE PAYROLL SYSTEM $24,960 $17,300 Implemented
BD0222 # 11 Y:2002 11 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10 $200 Not Implemented
BD0222 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,835 $2,232 Not Implemented
BD0221 # 08 Y:2002 08 2002 INSTALL OCCUPANCY SENSORS $365 $4,000 Implemented
BD0221 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $4,744 $1,500 Implemented
BD0221 # 04 Y:2002 04 2002 USE RADIANT HEATER FOR SPOT HEATING $2,178 $3,000 Not Implemented
BD0221 # 07 Y:2002 07 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $529 $900 Not Implemented
BD0221 # 10 Y:2002 10 2002 AUTOMATE PAYROLL SYSTEM $1,365 $2,500 Not Implemented
BD0221 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $555 $0 Implemented
BD0221 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,881 $3,000 Implemented
BD0221 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,340 $1,500 Implemented
BD0221 # 01 Y:2002 01 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $25,075 $56,000 Not Implemented
BD0221 # 09 Y:2002 09 2002 CLEAR AND RENT EXISTING SPACE $5,076 $1,000 Not Implemented