Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
96
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0259 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,010 | $29,034 | Implemented |
MZ0259 # 03 Y:2018 | 03 | 2018 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $140,488 | $304,000 | Not Implemented |
MZ0259 # 02 Y:2018 | 02 | 2018 | INSTALL OCCUPANCY SENSORS | $504 | $780 | Implemented |
MZ0259 # 04 Y:2018 | 04 | 2018 | RECOVER AND REUSE COOLING WATER | $63,427 | $203,000 | Implemented |
IC0209 # 03 Y:2018 | 03 | 2018 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $32,608 | $764 | Not Implemented |
IC0209 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,273 | $4,939 | Implemented |
IC0209 # 02 Y:2018 | 02 | 2018 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,222 | $11,728 | Not Implemented |
IC0208 # 01 Y:2018 | 01 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,360 | $0 | Not Implemented |
IC0208 # 02 Y:2018 | 02 | 2018 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $18,213 | $1,050 | Not Implemented |
IC0208 # 03 Y:2018 | 03 | 2018 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,005 | $9,970 | Not Implemented |
IC0208 # 04 Y:2018 | 04 | 2018 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $12,442 | $24,500 | Not Implemented |
IC0208 # 05 Y:2018 | 05 | 2018 | REPLACE DIRECT FIRED WITH STEAM HEAT | $12,205 | $25,158 | Not Implemented |
IP0109 # 05 Y:2018 | 05 | 2018 | INSTALL OCCUPANCY SENSORS | $1,506 | $1,246 | Not Implemented |
IP0109 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $30,301 | $51,647 | Implemented |
IP0109 # 03 Y:2018 | 03 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $19,901 | $2,251 | Not Implemented |
IP0109 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,107 | $59 | Implemented |
IP0109 # 01 Y:2018 | 01 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $8,423 | $0 | Implemented |
IP0109 # 07 Y:2018 | 07 | 2018 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $44,448 | $205,000 | Not Implemented |
IP0109 # 06 Y:2018 | 06 | 2018 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,342 | $5,885 | Implemented |
IC0207 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,822 | $7,531 | Not Implemented |
IC0207 # 04 Y:2018 | 04 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,736 | $7,996 | Not Implemented |
IC0207 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,473 | $13,820 | Not Implemented |
IC0207 # 03 Y:2018 | 03 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,822 | $290 | Not Implemented |
MZ0257 # 04 Y:2018 | 04 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,225 | $1,800 | Implemented |
MZ0257 # 05 Y:2018 | 05 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,826 | $0 | Implemented |