IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

229

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0128 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $633 $144 Implemented
WI0128 # 04 Y:1991 04 1991 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $704 $2,800 Implemented
WI0128 # 03 Y:1991 03 1991 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $755 $0 Implemented
WI0128 # 02 Y:1991 02 1991 INSTALL TIMERS AND/OR THERMOSTATS $704 $600 Implemented
WI0128 # 01 Y:1991 01 1991 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,060 $0 Implemented
WI0127 # 09 Y:1991 09 1991 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $917,100 $0 Not Implemented
WI0127 # 08 Y:1991 08 1991 INSTALL TIMERS AND/OR THERMOSTATS $138 $400 Not Implemented
WI0127 # 07 Y:1991 07 1991 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $389 $283 Not Implemented
WI0127 # 06 Y:1991 06 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $140 $276 Not Implemented
WI0127 # 05 Y:1991 05 1991 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,019 $0 Not Implemented
WI0127 # 04 Y:1991 04 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,042 $2,560 Not Implemented
WI0127 # 03 Y:1991 03 1991 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $8,373 $16,000 Not Implemented
WI0127 # 02 Y:1991 02 1991 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $12,150 $7,000 Not Implemented
WI0127 # 01 Y:1991 01 1991 USE DEMAND CONTROLLER OR LOAD SHEDDER $20,052 $15,000 Not Implemented
WI0126 # 10 Y:1991 10 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $533 $640 Not Implemented
WI0126 # 09 Y:1991 09 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $608 $0 Not Implemented
WI0126 # 08 Y:1991 08 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $810 $2,124 Not Implemented
WI0126 # 07 Y:1991 07 1991 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $1,665 $0 Not Implemented
WI0126 # 06 Y:1991 06 1991 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $782 $0 Not Implemented
WI0126 # 05 Y:1991 05 1991 INSTALL TIMERS AND/OR THERMOSTATS $2,078 $1,600 Not Implemented
WI0126 # 04 Y:1991 04 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,563 $500 Not Implemented
WI0126 # 03 Y:1991 03 1991 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $2,491 $10,000 Not Implemented
WI0126 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,921 $865 Not Implemented
WI0126 # 01 Y:1991 01 1991 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $9,767 $14,000 Not Implemented
MO0040 # 01 Y:1991 01 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,811 $1,781 Not Implemented