IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

433

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0086 # 02 Y:2004 02 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,538 $0 Implemented
IC0086 # 03 Y:2004 03 2004 REPAIR AND ELIMINATE STEAM LEAKS $4,044 $3,000 Implemented
IC0086 # 04 Y:2004 04 2004 INSTALL TIMERS AND/OR THERMOSTATS $7,600 $2,220 Not Implemented
IC0086 # 05 Y:2004 05 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $1,099 $2,050 Implemented
IC0086 # 06 Y:2004 06 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,738 $43,650 Implemented
IC0086 # 07 Y:2004 07 2004 UPGRADE CONTROLS ON COMPRESSORS $9,924 $1,130 Not Implemented
IC0086 # 08 Y:2004 08 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,905 $2,900 Implemented
BD0265 # 01 Y:2004 01 2004 USE RADIANT HEATER FOR SPOT HEATING $27,949 $4,200 Not Implemented
BD0265 # 02 Y:2004 02 2004 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $3,335 $20,000 Not Implemented
BD0265 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,398 $2,861 Not Implemented
BD0265 # 04 Y:2004 04 2004 USE SYNTHETIC LUBRICANT $4,332 $1,650 Not Implemented
BD0265 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,701 $1,200 Not Implemented
BD0265 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,323 $0 Not Implemented
BD0265 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,397 $2,200 Not Implemented
BD0265 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $782 $602 Not Implemented
BD0265 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $660 $424 Not Implemented
BD0265 # 10 Y:2004 10 2004 INSTALL OCCUPANCY SENSORS $393 $330 Not Implemented
BD0265 # 11 Y:2004 11 2004 USE EVAPORATION TO CONCENTRATE MATERIAL $13,608 $10,512 Not Implemented
BD0265 # 12 Y:2004 12 2004 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $307 $0 Not Implemented
BD0265 # 13 Y:2004 13 2004 USE POWER DURING OFF-PEAK PERIODS $115 $0 Not Implemented
IC0081 # 01 Y:2004 01 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $599 $0 Implemented
IC0081 # 02 Y:2004 02 2004 INSTALL SET-BACK TIMERS $2,895 $159 Implemented
IC0081 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,195 $600 Implemented
IC0081 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $347 $0 Implemented
IC0081 # 05 Y:2004 05 2004 UPGRADE OBSOLETE EQUIPMENT $411 $2,300 Not Implemented