Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Bradley University |
---|---|
Assessment Year | 2004 |
Principal Product | Metal Industrial Fasteners for Automotive Industry |
NAICS | 332722 - Bolt, Nut, Screw, Rivet, and Washer Manufacturing |
SIC | 3452 - Bolts, Nuts, Rivets, And Washers |
Sales | $10,000,000-$50,000,000 |
# of Employees | 186 |
Plant Area (Sq.Ft.) | 116,000 |
Annual Production | 17,000,000 Pounds |
Production Hrs. Annual | 5,460 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $227,048 | 7,993,537 | kWh | $0.03 |
Electricity Demand | $78,492 | 18,882 | kW-months/year | $4.16 |
Natural Gas | $128,353 | 26,251 | MMBtu | $4.89 |
TOTAL ENERGY COSTS | $440,017 | |||
RECOMMENDED SAVINGS* | $63,300 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7231 USE RADIANT HEATER FOR SPOT HEATING |
Savings: $27,949 Cost: $4,200 |
- | - | - | - | $27,949 | 5,159 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$27,949 5,159 MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR |
Savings: $3,335 Cost: $20,000 |
- | - | - | - | $3,335 | 616 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,335 616 MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $5,398 Cost: $2,861 |
$4,101 | 141,902 | $1,297 | 312 | - | - | - | - | - | - | - | - | - | - |
$4,101 141,902 kWh |
$1,297 312 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $4,332 Cost: $1,650 |
$3,291 | 113,886 | $1,041 | 250 | - | - | - | - | - | - | - | - | - | - |
$3,291 113,886 kWh |
$1,041 250 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,701 Cost: $1,200 |
$2,052 | 70,988 | $649 | 156 | - | - | - | - | - | - | - | - | - | - |
$2,052 70,988 kWh |
$649 156 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,323 Cost: - |
$1,764 | 61,044 | $559 | 134 | - | - | - | - | - | - | - | - | - | - |
$1,764 61,044 kWh |
$559 134 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,397 Cost: $2,200 |
$728 | 25,182 | $230 | 55 | - | - | - | - | - | - | $164 | - | $275 | - |
$728 25,182 kWh |
$230 55 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
$164 - $ |
$275 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $782 Cost: $602 |
$289 | 9,959 | $57 | 14 | - | - | - | - | - | - | $258 | - | $178 | - |
$289 9,959 kWh |
$57 14 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
$258 - $ |
$178 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $660 Cost: $424 |
$173 | 5,972 | $104 | 25 | - | - | - | - | - | - | $124 | - | $259 | - |
$173 5,972 kWh |
$104 25 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
$124 - $ |
$259 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $393 Cost: $330 |
$274 | 9,469 | $119 | 29 | - | - | - | - | - | - | - | - | - | - |
$274 9,469 kWh |
$119 29 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL |
Savings: $13,608 Cost: $10,512 |
- | - | - | - | - | - | $13,608 | 95,850 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$13,608 95,850 Tgal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION |
Savings: $307 Cost: - |
- | - | - | - | - | - | $43 | 6,540 | $264 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$43 6,540 Tgal |
$264 - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.3137 USE POWER DURING OFF-PEAK PERIODS |
Savings: $115 Cost: - |
- | - | $115 | 29 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
$115 29 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $63,300 Cost: $43,979 |
$12,672 | 438,402 | $4,171 | 1,004 | $31,284 | 5,774 | $13,651 | 102,390 | $264 | - | $546 | - | $712 | - | $12,672 438,402 kWh |
$4,171 1,004 kW-months/year |
$31,284 5,774 MMBtu |
$13,651 102,390 Tgal |
$264 - lb |
$546 - $ |
$712 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material |