IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

51

matching recommendations
Reset
NAICS 3255 Paint, Coating, and Adhesive Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0097 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $183 $639 Not Implemented
IP0097 # 04 Y:2018 04 2018 OPTIMIZE PLANT POWER FACTOR $7,330 $4,122 Not Implemented
IP0097 # 03 Y:2018 03 2018 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,492 $600 Implemented
IP0097 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,685 $275 Implemented
IP0097 # 01 Y:2018 01 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,602 $25 Implemented
IP0078 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $820 $4 Implemented
IP0078 # 02 Y:2017 02 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,032 $21 Implemented
IP0078 # 03 Y:2017 03 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $320 $752 Not Implemented
IP0078 # 04 Y:2017 04 2017 INSTALL OCCUPANCY SENSORS $1,354 $3,396 Implemented
BD0363 # 02 Y:2009 02 2009 INSTALL OCCUPANCY SENSORS $2,677 $1,875 Implemented
BD0363 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,251 $33,434 Implemented
BD0363 # 03 Y:2009 03 2009 DISCONNECT BALLASTS $591 $100 Not Implemented
BD0363 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,380 $0 Implemented
BD0363 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,364 $200 Implemented
BD0363 # 06 Y:2009 06 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,398 $7,180 Implemented
BD0363 # 07 Y:2009 07 2009 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $17,662 $3,500 Not Implemented
BD0363 # 08 Y:2009 08 2009 USE RADIANT HEATER FOR SPOT HEATING $22,508 $28,000 Not Implemented
BD0363 # 09 Y:2009 09 2009 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $271 $760 Implemented
BD0363 # 10 Y:2009 10 2009 MINIMIZE WATER USAGE $126 $954 Implemented
BD0363 # 11 Y:2009 11 2009 MINIMIZE WATER USAGE $361 $250 Not Implemented
IC0091 # 01 Y:2004 01 2004 REPAIR OR REPLACE STEAM TRAPS $1,701 $638 Implemented
IC0091 # 02 Y:2004 02 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $3,038 $1,315 Implemented
IC0091 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,889 $1,265 Implemented
IC0091 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,000 $11,805 Not Implemented
IC0091 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $466 $1,428 Not Implemented