IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

311

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0033 # 02 Y:2015 02 2015 INSTALL OCCUPANCY SENSORS $1,742 $240 Implemented
IP0033 # 03 Y:2015 03 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $520 $144 Not Implemented
IP0033 # 04 Y:2015 04 2015 USE BATCH FIRING WITH KILN "FURNITURE" SPECIFICALLY DESIGNED $4,925 $3,000 Not Implemented
IP0033 # 05 Y:2015 05 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,961 $1,864 Implemented
IP0033 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,018 $3,232 Implemented
IP0033 # 07 Y:2015 07 2015 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,865 $3,720 Not Implemented
IP0033 # 08 Y:2015 08 2015 OPTIMIZE PLANT POWER FACTOR $4,939 $10,200 Implemented
IP0033 # 09 Y:2015 09 2015 REPLACE AIR CURTAIN DOORS WITH SOLID DOORS $6,096 $25,603 Not Implemented
IP0028 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $545 $0 Implemented
IP0028 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $216 $13 Implemented
IP0028 # 03 Y:2014 03 2014 INSTALL SET-BACK TIMERS $1,201 $196 Implemented
IP0028 # 04 Y:2014 04 2014 INSTALL OCCUPANCY SENSORS $147 $76 Implemented
IP0028 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $282 $357 Implemented
IP0028 # 06 Y:2014 06 2014 INSULATE BARE EQUIPMENT $655 $2,312 Not Implemented
IP0028 # 07 Y:2014 07 2014 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $1,354 $5,025 Not Implemented
IP0025 # 01 Y:2014 01 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,805 $0 Not Implemented
IP0025 # 02 Y:2014 02 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $8,161 $0 Not Implemented
IP0025 # 03 Y:2014 03 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $471 $0 Not Implemented
IP0025 # 04 Y:2014 04 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,545 $0 Not Implemented
IP0025 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,759 $60 Not Implemented
IP0025 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,468 $0 Not Implemented
IP0025 # 07 Y:2014 07 2014 INSULATE BARE EQUIPMENT $2,123 $1,770 Not Implemented
IP0025 # 08 Y:2014 08 2014 INSTALL OCCUPANCY SENSORS $2,944 $3,961 Not Implemented
UD0852 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $156,438 $342,000 Not Implemented
UD0852 # 02 Y:2012 02 2012 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $13,731 $8,250 Not Implemented