IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0055 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,460 $1,880 Not Implemented
IP0055 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,177 $86 Implemented
IP0055 # 04 Y:2015 04 2015 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,413 $3 Not Implemented
IP0055 # 07 Y:2015 07 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $568 $1,146 Not Implemented
IP0055 # 03 Y:2015 03 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $1,460 $3 Implemented
IP0055 # 02 Y:2015 02 2015 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,351 $0 Implemented
IP0055 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,465 $3 Not Implemented
IP0042 # 07 Y:2015 07 2015 CLEAN EQUIPMENT IMMEDIATELY AFTER USE $96 $195 Implemented
IP0042 # 01 Y:2015 01 2015 USE OPTIMUM TEMPERATURE $2,079 $0 Implemented
IP0042 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,917 $38 Implemented
IP0042 # 03 Y:2015 03 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,617 $636 Implemented
IP0042 # 04 Y:2015 04 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,392 $6,312 Not Implemented
IP0042 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,570 $6,843 Not Implemented
IP0042 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $485 $1,183 Implemented
IP0036 # 05 Y:2015 05 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,188 $0 Not Implemented
IP0036 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $106 $240 Not Implemented
IP0036 # 09 Y:2015 09 2015 RECOVER AND REUSE COOLING WATER $188 $120 Not Implemented
IP0036 # 08 Y:2015 08 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,780 $1,780 Not Implemented
IP0036 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,161 $1,811 Not Implemented
IP0036 # 06 Y:2015 06 2015 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS $61 $19 Not Implemented
IP0036 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,492 $0 Not Implemented
IP0036 # 03 Y:2015 03 2015 INSTALL OCCUPANCY SENSORS $1,622 $560 Not Implemented
IP0036 # 02 Y:2015 02 2015 USE OPTIMUM TEMPERATURE $1,853 $0 Not Implemented
IP0036 # 01 Y:2015 01 2015 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $102,924 $0 Not Implemented
IP0033 # 05 Y:2015 05 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,961 $1,864 Implemented